NOTICE

Be  sure  to  turn  on  the  power  6  hours  before  operation  in
order  to  have  power  running  to  the  crankcase  heater  and
to protect the compressor.

During test operation, the outdoor unit and the indoor units will start
up.  Make  sure  that  the  preparations  of  all  indoor  units  are  finished
(field  piping,  electrical  wiring,  air  purge,  ...).  See  installation  manual
of the indoor units for details.

17.2

Checklist before commissioning

After  the  installation  of  the  unit,  first  check  the  items  listed  below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.

You  read  the  complete  installation  and  operation
instructions,  as  described  in  the 

installer  and  user

reference guide

.

Installation

Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.

Field wiring

Be  sure  that  the  field  wiring  has  been  carried  out
according  to  the  instructions  described  in  the  chapter

"15  Electrical  installation" 

[

4

  26],  according  to  the  wiring

diagrams and according to the applicable legislation.

Power supply voltage

Check the power supply voltage on the local supply panel.
The  voltage  MUST  correspond  to  the  voltage  on  the
nameplate of the unit.

Earth wiring

Be  sure  that  the  earth  wires  have  been  connected
properly and that the earth terminals are tightened.

Insulation test of the main power circuit

Using  a  megatester  for  500  V,  check  that  the  insulation
resistance  of  2  MΩ  or  more  is  attained  by  applying  a
voltage of 500 V DC between power terminals and earth.
NEVER use the megatester for the transmission wiring.

Fuses, circuit breakers, or protection devices

Check  that  the  fuses,  circuit  breakers,  or  the  locally
installed  protection  devices  are  of  the  size  and  type
specified  in  the  chapter 

"15  Electrical  installation" 

[

4

  26].

Be  sure  that  neither  a  fuse  nor  a  protection  device  has
been bypassed.

Internal wiring

Visually  check  the  electrical  component  box  and  the
inside  of  the  unit  for  loose  connections  or  damaged
electrical components.

Pipe size and pipe insulation

Be  sure  that  correct  pipe  sizes  are  installed  and  that  the
insulation work is properly executed.

Stop valves

Be  sure  that  the  stop  valves  are  open  on  both  liquid  and
gas side.

Damaged equipment

Check  the  inside  of  the  unit  on  damaged  components  or
squeezed pipes.

Refrigerant leak

Check the inside of the unit on refrigerant leakage. If there
is  a  refrigerant  leak,  try  to  repair  the  leak.  If  the  repair  is
unsuccessful,  call  your  local  dealer.  Do  not  touch  any
refrigerant  which  has  leaked  out  from  refrigerant  piping
connections. This may result in frostbite.

Oil leak

Check  the  compressor  for  oil  leakage.  If  there  is  an  oil
leak, try to repair the leak. If the repairing is unsuccessful,
call your local dealer.

Air inlet/outlet

Check  that  the  air  inlet  and  outlet  of  the  unit  is  NOT
obstructed  by  paper  sheets,  cardboard,  or  any  other
material.

Additional refrigerant charge

The amount of refrigerant to be added to the unit shall be
written  on  the  included  "Added  refrigerant"  plate  and
attached to the rear side of the front cover.

Installation of indoor units

Check that the units are properly installed.

Installation of capacity up unit

Check that the unit is properly installed, if applicable.

Installation date and field setting

Be sure to keep record of the installation date on the rear
of  the  front  panel  according  to  EN60335‑2‑40  and  keep
record of the contents of the field setting(s).

17.3

About the test run

Make  sure  to  carry  out  the  system  test  operation  after  the  first
installation.

The  procedure  below  describes  the  test  operation  of  the  complete
system.

NOTICE

If a capacity up unit is installed, conduct its test run AFTER
the test run of the outdoor unit.

17.4

To perform a test run (7-segment
display)

To perform a test run of the outdoor unit

Applicable for LRYEN10*.

1

Check that all the stop valves of the outdoor unit are fully open:
gas  and  liquid  stop  valves  on  both  refrigeration  and  air
conditioner side.

2

Check  that  all  electrical  components  and  refrigerant  piping  is
installed  correctly,  for  the  indoor  units,  outdoor  unit,  and  (if
applicable) capacity up unit.

3

Turn ON the power supply of all units: the indoor units, outdoor
unit and (if applicable) the capacity up unit.

4

Wait for about 10 minutes until the communication between the
outdoor  unit  and  indoor  units  is  confirmed.  The  7-segment
display is blinking during the communication test:

▪ If communication is confirmed, the display will be OFF.

▪ If  communication  is  not  confirmed,  an  error  code  will  be

displayed  on  the  remote  controller  of  the  indoor  units.  See

"18.1.1 Error codes: Overview" 

[

4

 37].

5

Turn  ON  the  operation  switch  of  the  outdoor  unit.  The
compressors and fan motors start to operate.

6

Turn  ON  the  remote  controller  of  the  air  conditioner.  See  the
operation  manual  of  the  indoor  unit  for  more  information  about
the temperature settings.

7

Check  that  the  unit  functions  without  error  codes.  See

"17.4.1 Test run checks" 

[

4

 36].

To perform a test run of the capacity up unit

Applicable for LRNUN5*.

Summary of Contents for LRYEN10A7Y1

Page 1: ...Installation and operation manual CO Conveni Pack outdoor unit and capacity up unit English Installation and operation manual CO Conveni Pack outdoor unit and capacity up unit LRYEN10A7Y1 LRNUN5A7Y1...

Page 2: ...mm 300 500 500 10 B B1 B2 B3 100 500 500 50 300 200 a a C1 C2 C3 C a 300 500 20 10 50 100 500 100 300 400 200 a A Y X h2 H2 500 h1 H1 1500 1...

Page 3: ...and service ports 19 13 2 1 To handle the stop valve 19 13 2 2 To handle the service port 20 13 2 3 Tightening torques 21 13 3 Connecting the refrigerant piping 21 13 3 1 To remove the spun pipes 21...

Page 4: ...from Daikin and in addition comply with applicable legislation and are performed by qualified persons only In Europe and areas where IEC standards apply EN IEC 60335 2 40 is the applicable standard I...

Page 5: ...tar system They can cause overheating electrical shock or fire Do NOT install a phase advancing capacitor because this unit is equipped with an inverter A phase advancing capacitor will reduce perform...

Page 6: ...bol This means that the batteries may NOT be mixed with unsorted household waste If a chemical symbol is printed beneath the symbol this chemical symbol means that the battery contains a heavy metal a...

Page 7: ...e executing any maintenance task WARNING Never replace a fuse with a fuse of a wrong ampere ratings or other wires when a fuse blows out Use of wire or copper wire may cause the unit to break down or...

Page 8: ...instruments or works of art NOTICE Do NOT use the system for cooling water It may freeze NOTICE For future modifications or expansions of your system A full overview of allowable combinations for futu...

Page 9: ...Phase diagram of R744 P bar T C 0 31 100 80 1 5 2 73 8 57 d c b a e P Pressure in bar T Temperature in C a Solid phase b Liquid phase c Vapour phase d Supercritical fluid e Triple point 57 C 5 2 bar 6...

Page 10: ...ge Restart the unit by switching operating switch OFF and ON If the problem persists refer to the service manual The stop valve of an outdoor unit is left closed Open the stop valve on both the gas an...

Page 11: ...unit a b a Outdoor unit b Capacity up unit NOTICE Use a belt sling of 20 mm wide that adequately bears the weight of the unit Forklift a b a Outdoor unit b Capacity up unit NOTICE Use filler cloth on...

Page 12: ...your dealer for assistance WARNING Only the refrigeration parts that are also designed to work with CO2 shall be connected to the system Individual control with a remote controller In case of a system...

Page 13: ...alculations see the reference guide of the indoor unit Appropriate measures INFORMATION Appropriate measures are field supply Choose and install all required appropriate measures in accordance with EN...

Page 14: ...echanical ventilation in accordance with EN 378 3 2016 12 2 Opening and closing the unit 12 2 1 To open the outdoor unit DANGER RISK OF ELECTROCUTION DANGER RISK OF BURNING SCALDING To gain access to...

Page 15: ...it b Capacity up unit 3 Attach the small front plates to the front panels a b 2 7 a Outdoor unit b Capacity up unit 12 3 Mounting the outdoor unit 12 3 1 To provide the installation structure Make sur...

Page 16: ...n bolts M12 It is best to screw in the foundation bolts until their length remains 20 mm above the foundation surface 20 mm NOTICE Prepare a water drainage channel around the foundation to drain waste...

Page 17: ...ion 13 1 2 Refrigerant piping material Piping material K65 copper iron alloy CuFe2P maximum operating pressure 120 bar Piping temper grade and thickness Piping refrigeration unit Piping type Outer dia...

Page 18: ...easily a c b a Showcase b Height difference 5 m c Trap The refrigerant suction piping must always run down a b a b a Outdoor unit or indoor unit b Flow direction in refrigerant suction piping To inst...

Page 19: ...15 9 t1 05 K65 Air conditioner side liquid pipe b 12 7 t0 85 K65 Air conditioner side gas pipe b 15 9 t1 05 K65 a Piping between branching areas C D c d b Piping from first branch to second branch B2...

Page 20: ...te and freeze between the screw thread As a result refrigerant may leak and the valve cap may break a b a Apply screw lock agent b Do NOT apply screw lock agent 5 Tighten the valve cap Also see 13 2 3...

Page 21: ...ese instructions are NOT followed correctly it may result in property damage or personal injury which may be serious depending on the circumstances To remove the spun piping 1 Open the stop valve cap...

Page 22: ...p valve gas refrigeration B Stop valve liquid refrigeration a Gas piping b Liquid piping 2 If applicable remove the knockout and connect the piping to the capacity up unit Side connection 3 Remove the...

Page 23: ...to withstand high pressures and which will prevent water dirt or dust entering the unit CAUTION Do NOT open the stop valve until you have measured the insulation resistance of the main power supply ci...

Page 24: ...th 20 mm Insulation sealing To prevent rain and condensed water entering the unit add a sealing between the insulation and the front panel of the unit a a a a b b a Sealing material b Front panel 14 C...

Page 25: ...4 the additional amount of refrigerant during test run 6 and the factory charged amount of refrigerant 5 see label on the unit The total amount of refrigerant in the system is thus 4 5 6 7 10 Note do...

Page 26: ...kg 5 Factory charged amount of refrigerant into outdoor unit kg 6 3 6 Additional amount of refrigerant charged when test run if required kg a 7 Total amount of refrigerant 5 6 7 kg 8 a The maximum amo...

Page 27: ...consultation with the distribution network operator if necessary that the equipment is connected only to a supply with a system impedance Zsys less than or equal to Zmax EN IEC 61000 3 12 provided tha...

Page 28: ...d1 d2 h h1 h2 d1 d2 X1M A1P X5M X4M X1M PE X1M X3M PE X1M A1P X2M X1M X3M PE k1 k l m k2 k4 k3 j 3N 50 Hz 380 415 V AC c1 c2 3N 50 Hz 380 415 V AC c1 c2 c1 c2 1N 50 Hz 220 240 V AC c1 c2 k5 a Capacity...

Page 29: ...b X5M X4M X1M PE X1M A1P X2M X1M X3M PE a Terminals on outdoor unit b Terminals on capacity up unit Terminal Screw size Tightening torque N m X1M Power supply M8 5 5 7 3 PE Protective earth screw M8...

Page 30: ...fixing b F2 F1 F1 X1M A1P c a F2 Q1 Q2 TO MULTIUNIT TO OUT DUNIT TO IN DUNIT d e 2 1 3 X5M a b c d e X1M A1P X5M 1 2 X1M A1P DIII transmission wiring a To capacity up unit b To indoor units air condit...

Page 31: ...rror occurs that causes unit operation to stop R P2 run signal connection optional when the compressor is running P1 P2 operation signal connection mandatory when the expansion valves of the connected...

Page 32: ...on of the capacity up unit a remote operation switch is required Use a voltage free contact for microcurrent 1 mA 12 V DC Connect to X3M 1 2 and set to Remote R E M O T E OFF O N S1S S1S Factory equip...

Page 33: ...ain PCB A1P of the outdoor unit and capacity up unit This involves the following field setting components Push buttons to give input to the PCB A 7 segment display to read feedback from the PCB DIP sw...

Page 34: ...lay goes to its default situation From there you can access mode 1 and mode 2 Initialisation default situation NOTICE Be sure to turn on the power 6 hours before operation in order to have power runni...

Page 35: ...side of the unit on refrigerant leakage If there is a refrigerant leak try to repair the leak If the repair is unsuccessful call your local dealer Do not touch any refrigerant which has leaked out fro...

Page 36: ...s and circuit breakers on the indoor unit PCB did not trip Operation parameters For a stable operation of the unit each of the following parameters should be in its range Parameter Range Root cause wh...

Page 37: ...the maintenance and repair works Quantities and kind of new reused recycled reclaimed refrigerant which have been charged on each occasion Quantities of refrigerant which have been transferred from th...

Page 38: ...downstream of indoor units error displayed on remote controller O Wrong combination of indoor units Check the number of connected indoor units Check if an indoor unit is installed that is not a possib...

Page 39: ...ata is available on the Daikin Business Portal authentication required 19 1 Piping diagram Outdoor unit HPS HPS HPS os L M H L SV RV M 15 9 C1220T H 15 9 C1220T H 15 9 C1220T H 19 1 C1220T H M M M Pre...

Page 40: ...19 2 Piping diagram Capacity up unit 15 9 C1220T H 15 9 C1220T H L RV M M HPS os H Pressure sensor Plate heat exchanger HPS Pressure switch Heat exchanger Check valve os Oil separator Service port RV...

Page 41: ...ted circuit board earth leakage detector E1HC Crankcase heater M1C E2HC Crankcase heater M2C E3HC Crankcase heater M3C L1R Reactor A3P L2R Reactor A4P L3R Reactor A5P M1C Motor compressor INV1 M2C Mot...

Page 42: ...Crankcase heater M1C F1U F2U Fuse T 6 3 A 250 V A1P F1U Fuse A6P F101U Fuse A4P F3U F4U Fuse B 1 A 250 V F401U F403U Fuse A3P F601U Fuse A2P HAP Light emitting diode service monitor is green A1P A2P...

Page 43: ......

Page 44: ...4P605461 1 2020 04 Copyright 2020 Daikin 4P605461 1 0000000K Verantwortung f r Energie und Umwelt...

Reviews: