4-18
4.8.6 Operation board (EC3)
X43A
X42A
X41A
Mountng hole (4 pcs.)
●
Replacement procedure
1. Removing operation board
1) Remove the three cables that connect to
operation board from the connector.
2) Remove the four mounting bolts.
2. Mounting operation board
Reverse the above procedure to mount operation
board using the four bolts and connect the cable.
3. Necessity for configuration setting
When using operation board from Daikin spare
parts, configuration setting is not required.
Configuration setting for operation board from
spare parts is not made but that memorized on
CPU board is automatically sent to operation
board when power is supplied.
4.8.7 PT/CT Board (EC7)
PT/CT board
(EC7)
This printed circuit board has the two functions as
a measuring instrument and protective device and
provide as an interface between the main circuit
(high voltage) and controller.
●
Function
Function
Description
Voltage
and phase
sequence
detection
Voltage and phase sequence
detection between R phase and S
phase is executed by transferring the
voltage waveform to the controller.
Current
detection
Total running current of EFM and
CFM are detected.
●
Replacement procedure
①
Loosen the four mounting bolts.
②
After replacing the main body, mount the
connector by following the original procedure.
③
After checking the connections thoroughly, carry
out P.T.I to confirm the operation.
Mounting hole (4 pcs.)
Connector X61A
T
S
(
S
)
R
04̲01-26̲LX10F11B̲En.indd 4-18
04̲01-26̲LX10F11B̲En.indd 4-18
2014/11/19 16:42:23
2014/11/19 16:42:23
https://daikin-p.ru
Summary of Contents for LX10F11B
Page 2: ...Revision A Correction of spelling 2012 9 28 https daikin p ru...
Page 6: ...https daikin p ru...
Page 82: ...https daikin p ru...
Page 92: ...https daikin p ru...
Page 127: ...5 9 5 6 Sequence https daikin p ru...
Page 128: ...5 10 Stereoscopic wiring diagram https daikin p ru...
Page 129: ...Revision A Correction of spelling 2012 9 28 https daikin p ru...