1-13
1.4.3 Dehumidification Mode (Option)
Dehumidification operation reduces the internal
relative humidity using the reheat coil that heats up
the air cooled by the evaporator.
Heat source of the reheat coil, like the defrosting
operation, uses high temperature refrigerant (hot
gas) discharged from the compressor.
This control is optional, and available for only the
unit equipped with a reheat coil.
The unit equipped with a reheat coil is set to "ON"
at factory referring to
*
12 Configuration Setting in
paragraph 2.3.
●
Setting for dehumidification control
Select ON for "Dehumidification Set" on the Mode
Set screen to enable dehumidification operation.
ON: When dehumidification operation is executed
OFF: When dehumidification operation is not executed
●
Display
After the settings are
complete, DEHUMID
will appear at the right
side of the screen.
●
LED display
The DEHUMID indicator (yellow) lights.
●
Dehumidification Operation
Dehumidification operation starts when the
following conditions are met during modulated
cooling in the chilled mode.
Hu
>
Setting Hu
+
7%
& SP
−
0.7
℃<
SS
<
SP
+
0.7
℃
& RS
≦
SP
+
2.0
℃
The above conditions are satisfied continuously for
10 minutes.
When dehumidification operation starts, it supplies
hot gas to the reheat coil. EFM runs at high speed.
Dehumidification Control
Modulated Cooling in Chilled
・
Hu
>
Setting Hu
+
7%
・
& SP
−
0.7
℃<
SS
<
SP
+
0.7
℃
・
& RS
≦
SP
+
2.0
℃
The above conditions are satisfied
continuously for 10 minutes.
・
Hu
<
Setting Hu + 7% continuously for 24 hours
・
SS
≧
SP
+
1.0
℃
& Out of range (upper limit)
continuously for 10 minutes*
①
・
SS
≧
SP
+
4.0
℃
continuously for 10 minutes
・
SS
<
SP
−
1.0
℃
continuously for 20 minutes*
①
・
SS
<
SP
−
1.0
℃
& compressor speed is 20 rps
continuously for 20 minutes.*
①
Any of the above conditions are satisfied.
* : Excepted under the following conditions
①
Within 3 hours after dehumidifying operation starts
●
Cancellation of Dehumidification operation
Select OFF for "Dehumidification Set" on the Mode
Set screen to cancel dehumidification operation.
RETURN 2.0C
▲
▼
SUPPLY
MODULATION
CFM
RSV
HSV
DMV
Valve chamber
Economizer
Reheat coil (option)
Condenser
Receiver
HPT
HPS
EMV
ESV
LSV
Dryer
EEV
LPT
Sight glass
Evaporator
EFM
PRV
Compressor
01章̲LX10F11B3̲TR16-02̲En.indd 1-13
01章̲LX10F11B3̲TR16-02̲En.indd 1-13
2016/02/02 9:09:35
2016/02/02 9:09:35
https://daikin-p.ru
Summary of Contents for LX10F11B3
Page 7: ...https daikin p ru ...
Page 83: ...https daikin p ru ...
Page 93: ...https daikin p ru ...
Page 121: ...https daikin p ru ...
Page 129: ...https daikin p ru ...
Page 138: ...6 9 6 6 Sequence AIR WATER COOLED AIR WATER COOLED https daikin p ru ...
Page 139: ...6 10 Stereoscopic wiring diagram AIR WATER COOLED https daikin p ru ...