1-14
1.4.4 Defrost Mode
●
Hot-Gas Defrost System
A hot gas system is adopted for the heat source;
I.e. the high temperature and high pressure
refrigerant discharged from the compressor is
supplied to the evaporator and drain pan for
defrosting. Since the ice built on the evaporator
is directly and evenly heated up from the inside,
defrosting can be efficiently performed.
●
Display
"DEFROST" is displayed
on the upper right of the
screen.
●
LED display
The DEFROST indicator (orange) lights.
●
Defrost operation
The pump-down operation is executed by closing
EEV and opening DMV first.
Then the defrost operation will start by closing
DMV and opening HSV and hot gas is supplied to
the evaporator and drain pan. During defrosting,
the compressor speed is adjusted in order to
maintain the optimum hot gas temperature. (High
Pressure Constant Control). Release control
(DMV open, CFM ON) or charge control (ESV and,
EMV open) may be carried out depending on the
operating conditions. After termination of defrosting,
normal temperature control operation will start.
However, the delay timer will cause the evaporator
fan to remain stopped for a maximum of 3 minutes.
●
In-Range masking
The control temperature temporarily becomes out-
rage during defrosting, but the IN RANGE LED is
kept ON.
This will avoid misunderstanding that there will be a
problem if the IN RANGE LED is turned OFF.
●
Defrost Initiation
Pull-down
Short timer
6Hr
(
12Hr when RS<-15
℃)
Automatic
detecting
When supply air temperature does not
drop 0.2
℃
per 1 hr in frozen mode.
"AUTO"
In-Range
Defrost
interval
setting
Defrost interval setting
"3, 6, 9, 12 or 24" Hr
Out-range
timer
Executed by 30 min. timer
after the control temperature
rises out of in-range.
Manual Defrost
Executed by Manual defrost key.
●
Defrost Initiation Conditions
Timer Count-down
Initiation Conditions
Defrost interval (Frozen)
Short timer
Out-range timer
Manual defrost
EOS
≦
20.0
℃
Defrost interval (Chilled)
EOS
≦
20.0
℃
& EIS<5.0
℃
If the initiation conditions are not satisfied when
timer counts down, the defrosting will not be
initiated. If "AUTO" is selected, defrosting will be
executed automatically in accordance with the
accumulation of ice on the evaporator coil.
●
Defrost Termination Conditions
Defrosting Time
Termination Conditions
<
45 minute
EOS
≧
20
℃
& (RS
≧
5
℃
or RS
≧
5
℃
with 10 min.
elapse if RS<-20
℃
at defrost initiation)
≧
45 minute
EOS
≧
25
℃
& (RS
≧
15
℃
or RS
≧
5
℃
with 10 min.
elapse if RS<-20
℃
at defrost initiation)
90 minute
Defrost is forcibly terminated at
90 minutes. (E207
)
Economizer
Reheat coil (option)
Condenser
Receiver
Compressor
HPT
HPS
EMV
ESV
LSV
Dryer
EEV
LPT
Sight glass
Evaporator
CFM
EFM
RSV
HSV
PRV
DMV
▲
▼
01章̲LX10F11B3̲TR16-02̲En.indd 1-14
01章̲LX10F11B3̲TR16-02̲En.indd 1-14
2016/02/02 9:09:36
2016/02/02 9:09:36
https://daikin-p.ru
Summary of Contents for LX10F11B3
Page 7: ...https daikin p ru ...
Page 83: ...https daikin p ru ...
Page 93: ...https daikin p ru ...
Page 121: ...https daikin p ru ...
Page 129: ...https daikin p ru ...
Page 138: ...6 9 6 6 Sequence AIR WATER COOLED AIR WATER COOLED https daikin p ru ...
Page 139: ...6 10 Stereoscopic wiring diagram AIR WATER COOLED https daikin p ru ...