2-12
※
5-2 Trip Report
The Trip report shows the trip data for up to 84 days
(12 weeks) starting from the present.
The logging interval is the value that is selected in
the configuration settings.
To be displayed as an event when an alarm occurs.
※
5-5 Automatic Pumpdown
Step 1. Press
key to start Automatic Pumpdown.
"Preparation for
…
" is displayed if it is started soon after I/O switch ON since start-up control is activated.
*
"Pump Down Activated" is displayed during Automatic Pumpdown operation
Step 2. After the operation is completed, "GOOD" is displayed. Alarm E202 (Automatic pumpdown failure)
is displayed when the automatic pumpdown is failed. Turn I/O switch OFF to complete pumpdown.
Auto Pump down
Good
Auto Pump down
Pump Down
Activated
During Automatic Pumpdown
In preparation
Auto Pump down
Press
ENTER to Start
ESC to Cancel
After operation completion
Auto Pump down
Press ESC to Cancel
Preparation for
Pump Down ---
※
5-4 Alarm Record
Display the alarm
generated at the
present and in the
past maximum
180 days.
※
5-6 Monitoring Log
This function stores data generated during operation
such as temperature sensor values, pressure values
and valve opening value onto USB memory.
By monitoring this data, it is possible to understand
the status of the operation more accurately.
Step 1. Insert USB memory. (CPU board)
Step 2. Press
key to start Monitoring Log. During
Monitoring Log, "LOGGING (USB)" is
displayed on the operation screen.
Step 3. To complete the Monitoring Log, access
to operation screen
⇒
Service menu
⇒
Monitoring Log and execute "Enter to Stop".
Caution !!
1. Remove the USB memory after confirming that the "LOGGING (USB)" display has turned off.
If the USB memory is removed while monitoring log is still in progress, the data files may become corrupted.
2. The data files are saved at intervals of one per hour.
3. The file size of a single data file is approximately 400 KB.
1/131
Trip Report
Time SP(C) DSS(C) DRS(C) SHU(%) HU(%)
NEXT
21:00 –30.0 –30.3 –30.3 75 75
20 MAY,2009
20:00 –30.0 –30.1 –30.3 75 75
19:00 –30.0 –30.1 –30.1 75 75
18:00 –30.0 –30.6 –30.6 75 75
21:00 –30.0 –30.3 –30.3 75 75
19 MAY,2009
20:34 F5FF
20:00 –30.0 –30.1 –30.3 75 75
19:00 –30.0 –31.1 –30.9 75 75
18:00 –30.0 –30.6 –30.8 75 75
17:00 –30.0 –30.5 –30.0 75 75
16:00 –30.0 –31.2 –31.8 75 77
15:00 –30.0 –25.7 –26.3 75 79
14:00 –30.0 –10.3 –11.0 75 79
16:32 E201
※
5-3 PTI History
Shows up to five
sets of the latest
successful PTI
History in the past.
Monitoring Log
Monitoring Log
CHILLED
HP : 1200kPa
LP : 20kPa
MODULATION
DEF- INT AUTO
RETURN 1.7
℃
SET POINT
SUPPLY
-1.1
˚C
SET- MODE
LOGGING(USB)
CHILLED
HP : 1200kPa
LP : 20kPa
MODULATION
DEF- INT AUTO
RETURN 1.7
℃
SET POINT
SUPPLY
SET- MODE
-1.0
˚
C
-1.1
˚C
-1.0
˚
C
PTI History
3Hour Ago
Chilled PTI 21 DEC,2010 21:38
25Day 5Hour Ago
Short PTI 21 DEC,2010 19:05
25Day 8Hour Ago
Full PTI 15 NOV,2010 17:10
31Day 10Hour Ago
Full PTI 15 JAN,2011 23:45
Short PTI 21 AUG,2010 15:05
120Day 8Hour Ago
Alarm Record
1 APR,2010 8:43 F701
USDA #1 sensor failure
20 MAY,2010 21:15 E425
1 APR,2010 8:43 E425
1 APR,2010 8:43 E5FF
5 JAN,2009 14:58 E425
NEXT
02章01-18̲LX10F11B3̲TR16-02̲En.indd 2-12
02章01-18̲LX10F11B3̲TR16-02̲En.indd 2-12
2016/02/03 16:14:34
2016/02/03 16:14:34
https://daikin-p.ru
Summary of Contents for LX10F11B3
Page 7: ...https daikin p ru ...
Page 83: ...https daikin p ru ...
Page 93: ...https daikin p ru ...
Page 121: ...https daikin p ru ...
Page 129: ...https daikin p ru ...
Page 138: ...6 9 6 6 Sequence AIR WATER COOLED AIR WATER COOLED https daikin p ru ...
Page 139: ...6 10 Stereoscopic wiring diagram AIR WATER COOLED https daikin p ru ...