3-8
3.4 Periodic Inspection
Always to operate the unit normally, periodic inspections for each parts are required in order to confirm the
unit condition and maintenance separately pre-trip inspection.
The following table shows an example of the inspection plan.
No.
Inspection item
Inspection content
2nd year 4th year 8th year
Gener
al str
ucture
1
Inspection for physical
damage
✓
✓
✓
2 Loose mounting bolts
✓
✓
✓
3
Condition of panels, hinge
and lock
✓
✓
✓
4
Control box and
Inverter box inspection
1) Cover packing inspection and
replacement
✓
✓
✓
2) Loose cable gland
✓
✓
✓
3) Internal cleaning
✓
✓
✓
5
Air leakage from unit
casing
Air leakage and clearance
✓
✓
✓
6
Seal inspection and
replacement
Ventilator cover packing
✓
✓
✓
7
Painted area recondition
(Touch-up paint)
1) Compressor
✓
✓
✓
2) Receiver
✓
✓
✓
3) Solenoid valve (coil cover)
✓
✓
✓
4) Unit
✓
✓
8 Repainting
1) Compressor
✓
2) Receiver
✓
3) Condenser fan motor
✓
4) Condenser fan
✓
Refr
iger
ant system
1 Refrigerant leakage
✓
✓
✓
2 Compressor
Water entering to compressor
electrical terminal
✓
✓
✓
3
Inspection and replacement
of sight glass
✓
4
Condition of cramp on
the refrigerant pipes and
gauge pipes
✓
✓
✓
5
Condition of thermal
insulation of refrigerant pipe
✓
✓
✓
6
Evaporator coil cleaning
(by water)
✓
✓
✓
7 Condenser coil cleaning
1) Water-cleaning
✓
✓
✓
2) Steam-cleaning (after pumping
down the refrigerant)
✓
✓
✓
03章̲LX10F11B3̲TR16-02̲En.indd 3-8
03章̲LX10F11B3̲TR16-02̲En.indd 3-8
2015/12/21 15:43:11
2015/12/21 15:43:11
https://daikin-p.ru
Summary of Contents for LX10F11B3
Page 7: ...https daikin p ru ...
Page 83: ...https daikin p ru ...
Page 93: ...https daikin p ru ...
Page 121: ...https daikin p ru ...
Page 129: ...https daikin p ru ...
Page 138: ...6 9 6 6 Sequence AIR WATER COOLED AIR WATER COOLED https daikin p ru ...
Page 139: ...6 10 Stereoscopic wiring diagram AIR WATER COOLED https daikin p ru ...