16
3-36
3.5 Battery
3.5.1 Specifications
Controller can use Rechargeable batteries. It is not possible to exchange the type of battery
afterwards.
The battery is positioned on CPU & I/O box in controller box.
Rechargeable: DAIKIN original rechargeable battery
3.5.2 Function
This battery is used without main power supply for the following functions.
1) Display wake up (Refer to chapter 3.3.2) page 3-11.
Setting/Display the following items on the LCD display.
<Display>
Temperature on the return air sensor
Temperature on the supply air sensor
<Setting change>
Inside temperature, defrosting interval, dehumidifying set (Optional), Unit ON/OFF
2) USDA data log
USDA sensors data log every 1 hour
Note) When the Alkaline battery is equipped, it must be replaced for a new every PTI, when USDA is
used.
3) Trip data log
Trip data; Setting point, Supply air, Return air, Humidity and time is logged every 1 hour after power off
until battery run out. (Min. 3 days)
3.5.3 Battery check
Rechargeable battery : Press "Battery check meter"
Green : Full charge
Red : Battery charging
No light : Charge or replace
001-030̲E-SM(LXE10E-1E)A4 2007.04.27 13:29 ページ 16
https://daikin-p.ru
Summary of Contents for LXE10E-1
Page 32: ...31 7 10 7 14 Schematic wiring diagram LXE10E 1E https daikin p ru...
Page 33: ...32 https daikin p ru...
Page 34: ...33 7 11 7 15 Stereoscopic wiring diagram LXE10E 1E https daikin p ru...
Page 35: ...34 https daikin p ru...
Page 49: ...48 2 22 2 5 4 3 12 RSV CSV DEHUMID LED 1 30 RH 95 RH LXE10E 1 LXE10E 1A https daikin p ru...
Page 55: ...54 4 6 1 2 P 4 3 P 3 56 3 L LP HP LXE10E 1 LXE10E 1A LXE10E 1 LXE10E 1A https daikin p ru...
Page 58: ...57 4 18 2 120 248 F EV EV 4 2 5 TEV VTX 3410DMS 1 120 248 F https daikin p ru...
Page 66: ...65 LXE10E 1E 7 10 https daikin p ru...
Page 67: ...66 https daikin p ru...
Page 68: ...67 LXE10E 1E 7 11 https daikin p ru...
Page 69: ...68 https daikin p ru...
Page 105: ...Parts related with option 3 Indoor fanguard K1 TR06 13 104 https daikin p ru...