4-13
3. Vacuum in the refrigerant system
1) Connect the vacuum pump to the
connection port as shown in the figure on
previous page.
2) Vacuum up to 75.5cmHg or more.
4. Filling a specified amount of refrigerant.
1) Connect the gauge manifold as shown in
the diagram below and fill a specified
amount of refrigerant.
(Refrigerant: R-134a LXE10E-A: 4.6kg.
LXE10E-1: 5.4kg)
t
R134a
e
R134a
5. Flushing operation and oil contamination
1) Set the unit to SP-20, and carry out the
pull-down operation for about 30 minutes.
2) Check the oil contamination.
3) Repeat steps 1 to 7 if the oil is still dirty.
6. Adjustment of oil quantity
Refer to "(4) Removal of excess refrigerant oil
after compressor replacement on page 4-11.
7. Replacement of dryer filter
1) Carry out the automatic pump down.
2) Replace the dryer filter.
(Tightening torque: LXE10E-A: 54.9N.m,
LXE10E-1: 28.0N.m)
8. Checking refrigerant gas leaks
9. Securely apply touch-up and silicon sealant
to each part.
[Reference]
Compressor oil gauge part number : 1520444
Discharge flange packing
: 0132192
Suction flange packing
: 0395032
Compressor oil (FVC-46D) part number:
1. 1L can
: 99S0843
2. 1L can *24 pieces : 99S0030
3. 4L can *6 pieces : 99S0815
4. 18L can *1 piece : 9990188
Figure 1
Figure 2
https://daikin-p.ru