27
Storage waiting for installation
Waiting for the installation, the components of the machine and the relative documents must be stored
in an area that:
-
Is dedicated exclusively to the storage of the components.
-
Is covered and protected from the weather (preferably prepare a closed area), with adequate temperature and humidity.
-
Is accessible only to operators tasked with the assembly.
-
Can support the weight of the equipment (check the load rating) and has a stable floor.
-
Is free from other components, especially if they are potentially explosive/incendiary/toxic.
If you cannot proceed with the installation straight away, check periodically that the above-men-
tioned conditions of the storage area are maintained and cover the machine with a canvas.
While waiting for the finale installation, always provide an insulating base (e.g., wood blocks) be-
tween the floor and the machine itself.
3
5÷35°C
90% max
Any movement carried out after unpacking must be done with the doors closed. Do not move
the units by pulling on the doors, if present, the uprights or other protruding parts that are not
an integral part of the structure.
Do not step on the units!
Correct storage awaiting installation
Summary of Contents for Modular Plate
Page 15: ...15 Notes...
Page 28: ...28 Notes...
Page 33: ...33 VDI 6022 6...
Page 34: ...34 1 x TE8x35 1 x 8 5 1 x M8 2 x TE8x35 2 x 8 5 2 x M8 7...
Page 43: ...43 3 4 5 x 1 100mm 100mm 250mm 250mm 250mm 10 100mm 5mm...
Page 44: ...44 6 7 NO OK...
Page 45: ...45 H2O SOAP 8...
Page 46: ...46 9...
Page 47: ...47 Notes...
Page 62: ...62 Repair log DATE SERVICE TYPE TIME REQUIRED SIGNATURE...