ESIE17-08
|
Part 3. Repair
3.1. Refrigerant repair procedures
Page 62
15/11/18
|
Version 1.1
R32 Sky-Air RZAG-M
In case of 1 service port at the stop valves
Figure 3-1: 1 service port at the stop valves
.
In case of 2 service ports at the stop valves
Connect both stop valve service ports to the manifold.
In case of 3 service ports at the stop valves
Connect 1 hose to the suction stop valve service port and 1 hose to the service port between the expansion valve and outdoor H/E.
1. Vacuum pump
3. To recovery pump
2. Connect flexible hose to service port 3 stop valve
I
NFORMATION
See instruction of the recovery pump supplier how to recover the refrigerant.
1
3
2