20
|
Configuration
Installer and user reference guide
122
REYQ8~20+REMQ5U7Y1B
VRV IV+ heat recovery
4P561154-1A – 2020.10
20 Configuration
In this chapter
20.1 Overview: Configuration
This chapter describes what you have to do and know to configure the system after
it is installed.
It contains information about:
▪
Making field settings
▪
Energy saving and optimum operation
▪
Using the leak detection function
INFORMATION
It is important that all information in this chapter is read sequentially by the installer
and that the system is configured as applicable.
DANGER: RISK OF ELECTROCUTION
20.2 Making field settings
20.2.1 About making field settings
To continue the configuration of the VRV IV heat recovery system, it is required to
give some input to the PCB of the unit. This chapter will describe how manual input
is possible by operating the push buttons on the PCB and reading the feedback
from the 7‑segment displays.
Making settings is done via the master outdoor unit.
Next to making field settings it is also possible to confirm the current operation
parameters of the unit.
Summary of Contents for REMQ5U7Y1B
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ...4P561154 1A 2020 10 Copyright 2018 Daikin Verantwortung für Energie und Umwelt ...