8
|
Operation
Installer and user reference guide
30
REYQ8~20+REMQ5U7Y1B
VRV IV+ heat recovery
4P561154-1A – 2020.10
To stop
4
Press the ON/OFF button on the user interface once again.
Result:
The operation lamp goes out and the system stops operating.
NOTICE
Do not turn off power immediately after the unit stops, but wait for at least 5
minutes.
8.3.3 To use the dry program (WITH cool/heat changeover remote control switch)
To start
1
Select cooling operation mode with the cool/heat changeover remote control
switch.
1
1
2
Press the operation mode selector button on the user interface several times
and select (program dry operation).
3
Press the ON/OFF button of the user interface.
Result:
The operation lamp lights up and the system starts operating.
4
Press the air flow direction adjust button (only for double-flow, multi-flow,
corner, ceiling-suspended and wall-mounted). Refer to
To stop
5
Press the ON/OFF button on the user interface once again.
Result:
The operation lamp goes out and the system stops operating.
NOTICE
Do not turn off power immediately after the unit stops, but wait for at least 5
minutes.
8.4 Adjusting the air flow direction
Refer to the operation manual of the user interface.
8.4.1 About the air flow flap
Double flow+multi-flow units
Corner units
Summary of Contents for REMQ5U7Y1B
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ...4P561154 1A 2020 10 Copyright 2018 Daikin Verantwortung für Energie und Umwelt ...