Piping installation
Installer and user reference guide
78
REYQ8~20+REMQ5U7Y1B
VRV IV+ heat recovery
4P561154-1A – 2020.10
d
LT Hydrobox unit
e
HT Hydrobox unit
Pipe
Maximum length (actual/equivalent)
Longest pipe from the outdoor unit or
the last multi-outdoor piping branch
(1+2, 1+3, 1+5)
135 m/160 m
(a)
Longest pipe after the first branch (2, 3,
5)
40 m
In case of a multi-outdoor setup:
longest pipe from the outdoor unit to
the last multi-outdoor piping branch (4)
10 m/13 m
Total pipe length
300 m/600 m
(b)
(a) If the equivalent piping length is more than 90 m, size up the main liquid piping
according to
.
(b) In this case, both are actual piping lengths: outdoor units ≤20 HP / outdoor units
>20 HP.
Connection with VRV DX indoor units and air handling units
H3
1
2
H1
H2
H4
3
4
a
b
b
b
c
d
e
d
e
f
f
5
a
Outdoor unit
b
VRV DX indoor unit
c
Multi BS unit
d
BS unit
e
EKEXV kit
f
AHU
Pipe
Maximum length (actual/equivalent)
Longest pipe from the outdoor unit or
the last multi-outdoor piping branch
(1+2, 1+3, 1+5)
165 m/190 m
(a)
Longest pipe after the first branch (2, 3,
5)
40 m/—