Piping installation
Installer and user reference guide
84
REYQ8~20+REMQ5U7Y1B
VRV IV+ heat recovery
4P561154-1A – 2020.10
NOTICE
Make sure the field piping and connections are NOT subjected to stress.
WARNING
During tests, NEVER pressurize the product with a pressure higher than the
maximum allowable pressure (as indicated on the nameplate of the unit).
WARNING
Take sufficient precautions in case of refrigerant leakage. If refrigerant gas leaks,
ventilate the area immediately. Possible risks:
▪
Excessive refrigerant concentrations in a closed room can lead to oxygen
deficiency.
▪
Toxic gas might be produced if refrigerant gas comes into contact with fire.
WARNING
ALWAYS recover the refrigerant. Do NOT release them directly into the environment.
Use a vacuum pump to evacuate the installation.
▪
Only use phosphoric acid deoxidised seamless copper.
NOTICE
After all the piping has been connected, make sure there is no gas leak. Use nitrogen
to perform a gas leak detection.
18.2.3 Multiple outdoor units: Knockout holes
Connection
Description
Front connection
Remove the front plate knockout holes to connect.
Bottom connection
Remove the knockout holes on the bottom frame and
route the piping under the bottom.
18.2.4 To route the refrigerant piping
Installation of refrigerant piping is possible as front connection or side connection
(when taken out from the bottom) as shown in the figure below.