General Information
59
3.2.14
Installation of Outdoor Unit
Operational steps
Note:
1. The proportions of cement : sand : gravel for the concrete shall be 1 : 2 : 4, and ten
reinforcement bars that their diameter are 6/16"-7/16", (approx. 12" intervals) shall be placed.
2. The surface shall be finished with mortar. The corner edges shall be chamfered.
3. When the foundation is built on a concrete floor, rubble is not necessary. However, the surface of
the section on which the foundation is built shall have rough finish.
4. A drain ditch shall be made around the foundation to thoroughly drain water from the equipment
installation area.
5. When installing the equipment on a roof, the floor strength shall be checked, and water-proofing
measures shall be taken.
Bolt pitch
Prepare foundation
Install outdoor unit
(V1150)
2"
12HP
43 3/8
51 3/8
REYQ96MTJU
3D040102A
28 11/16"
36 9/16"
4"
4"
3 1/8"
3 1
/8"
3 1/8"
4"
4"
2"
2"
3"
6 1/2"
6 1/2"
Model
A (in.)
B (in.)
REYQ96MTJU
43 3/8
4-
φ
19/32" dia. holes
28 7/16-29"
Summary of Contents for REYQ96MTJU
Page 1: ...Design Installation Testing Instruction R410A Heat Recovery 60Hz REYQ96MTJU Si39 406...
Page 6: ...Si39 406 iv Table of Contents...
Page 34: ...Installation Si39 406 28 General Information Flaring Procedure...
Page 68: ...Installation Si39 406 62 General Information Caution Caution label 3P124617 4P124614...
Page 114: ...Appendix Si39 406 108 General Information 3P135887 1...
Page 126: ...Appendix Si39 406 120 General Information 7 8 3 BS Unit BSVQ36MVJ BSVQ60MVJ 4D045338...
Page 128: ...Appendix Si39 406 122 General Information 7 9 2 Field Wiring REYQ96MTJU 3D042647A...
Page 156: ...Refrigerant Piping Si39 406 150 Installation Manual REYQ96MTJU...
Page 158: ...Refrigerant Piping Si39 406 152 Installation Manual REYQ96MTJU...
Page 230: ...Precautions for New Refrigerant R410A Si39 406 224 Precautions for New Refrigerant R410...
Page 236: ...375 Park Avenue Suite 3308 New York N Y 10152 info daikinac com www daikinac com...