Installation
SiE33-003
44
General Information
2. After piping, check to make sure draining flows smoothly.
If construction work for interconnecting piping is complete:
Using a plastic container for water filling, etc., gradually inject about 1,000 cc of water into the drain pan
through the inspection hatch.
Note:
To drain water from the drain pan, use the drainage port for maintenance.
WHEN ELECTRIC WIRING WORK IS FINISHED
Check drainage flow during COOL running, explained under “TEST OPERATION”.
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
Remove the electric parts box lid, connect a power supply and remote control to the terminals.
Next, press the inspection/test operation button “
” on the remote control. The unit will engage the
test operation mode. Press the operation mode selector button “
” until selecting FAN
OPERATION “
”. Then, press the ON/OFF button “
”. The indoor unit fan and drain pump will
start up. Check that the water has drained from the unit. Press “
” to go back to the first mode.
Si33-003.book Page 44 Monday, June 25, 2001 9:06 AM