SiK401004_A
MAINTENANCE
124
Disassembly of evaporator
Remark: Make sure that the power supply is cut off and protect the copper tube and aluminum fin. If the time for disassembly
shall be long, put the copper tube under pressurized condition.
Step Illustration
Handling
Instruction
1. Disassembly of
fixing screws on the
side panels of
evaporator
●
Remove the screw
connecting left and right side
panels on the evaporator
and the upper cover plate.
(As shown in the arrow’s
direction in the illustration.)
2. Disassembly of the
screws connecting
evaporator valve
seal-plate and joint
flange
●
Remove the screws on the
valve seal-plate and remove
the valve seal-plate.
Remove the screws on the
evaporator’s joint flange. (As
shown in Illustration, box
represents the screws on
seal-plates while circle the
screws on joint flange.
3. Removal of
evaporator
●
Remove the evaporator.
Removed evaporator is
shown in the illustration.
Summary of Contents for RY24PEV1K
Page 12: ...SiK401004_A SPECIFICATIONS 4 2 NOMENCLATURE 24 E K M V1...
Page 36: ...SiK401004_A SPECIFICATIONS 28 5 PIPING DIAGRAM...
Page 80: ...SiK401004_A INSTALLATION 72 2 5 Installation Clearance Data Figure 2 5 1...
Page 110: ...SiK401004_A MAINTENANCE 102 3 1 2 R24PEV1K 6 3 6 2 5 6 4 3...
Page 111: ...SiK401004_A 103 MAINTENANCE 3 1 3 RY30PEV1K 6 3 6 2 5 3 6 6...
Page 112: ...SiK401004_A MAINTENANCE 104 3 1 4 R30PEV1K 6 3 6 2 5 6 5 0...
Page 113: ...SiK401004_A 105 MAINTENANCE 3 1 5 RY36PEY1K...
Page 114: ...SiK401004_A MAINTENANCE 106 3 1 6 R36PEY1K L L...
Page 115: ...SiK401004_A 107 MAINTENANCE 3 1 7 RY42PEY1K RY48PEY1K L L...
Page 116: ...SiK401004_A MAINTENANCE 108 3 1 8 R42PEY1K R48PEY1K L L...