22
|
Maintenance and service
Installer and user reference guide
152
RYYQ+RYMQ+RXYQ
VRV IV+ heat pump
4P546228-1C – 2021.11
22 Maintenance and service
NOTICE
Maintenance MUST be done by an authorised installer or service agent.
We recommend performing maintenance at least once a year. However, applicable
legislation might require shorter maintenance intervals.
NOTICE
Applicable legislation on
fluorinated greenhouse gases
requires that the refrigerant
charge of the unit is indicated both in weight and CO
2
equivalent.
Formula to calculate the quantity in CO
2
equivalent tonnes:
GWP value of the
refrigerant × total refrigerant charge [in kg] / 1000
In this chapter
22.1 Maintenance safety precautions
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
NOTICE: Risk of electrostatic discharge
Before performing any maintenance or service work, touch a metal part of the unit in
order to eliminate static electricity and to protect the PCB.
22.1.1 To prevent electrical hazards
When performing service to inverter equipment:
1
Do NOT open the electrical component box cover for 10 minutes after turning
off the power supply.
2
Measure the voltage between terminals on the terminal block for power
supply with a tester and confirm that the power supply is shut off. In addition,
measure points as shown in the figure, with a tester and confirm that the
voltage of the capacitor in the main circuit is less than 50 V DC. If the voltage
measured is still higher than 50 V DC, discharge the capacitors in a safe
manner by using a dedicated capacitor discharge pen to avoid possibility of
sparking.
Summary of Contents for RYYQ8U7Y1B
Page 174: ......
Page 175: ......
Page 176: ...4P546228 1C 2021 11 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...