17
|
Piping installation
Installer and user reference guide
69
RYYQ+RYMQ+RXYQ
VRV IV+ heat pump
4P546228-1C – 2021.11
17 Piping installation
In this chapter
17.1 Preparing refrigerant piping
17.1.1 Refrigerant piping requirements
NOTICE
The refrigerant R410A requires strict cautions for keeping the system clean, dry and
tight.
▪
Clean and dry: foreign materials (including mineral oils or moisture) should be
prevented from getting mixed into the system.
▪
Tight: R410A does not contain any chlorine, does not destroy the ozone layer,
and does not reduce earth's protection against harmful ultraviolet radiation.
R410A can contribute to the greenhouse effect if it is released. Therefore pay
special attention to check the tightness of the installation.
Summary of Contents for RYYQ8U7Y1B
Page 174: ......
Page 175: ......
Page 176: ...4P546228 1C 2021 11 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...