Since the side boards may be deformed if only a torque wrench
is used when loosening or tightening flare nuts, always lock the
stop valve with a wrench and then use a torque wrench.
Do not place wrenches on the valve cover.

Applying an excessive torque may distort the interior stop valve
surface causing gas to leak inside the valve and causing the
flare nut to crack eventually.
Do not apply force on the valve cover, this may result in a
refrigerant leak.

For cooling operation under low ambient temperature or any
other operation under low pressure, apply silicon pad or similar
to prevent freezing of the gas stop valve flare nut (see figure).
Freezing of the flare nut may cause refrigerant leak.

How to use the stop valve

Use hexagonal wrenches 4 mm and 6 mm.

Opening the valve

1.

Place the hex wrench on the valve bar and turn counter-
clockwise.

2.

Stop when the valve bar no longer turns. It is now open.

Closing the valve

1.

Place the hex wrench on the valve bar and turn clockwise.

2.

Stop when the valve bar no longer turns. It is now closed.

Cautions for handling the valve cover

The valve cover is sealed where indicated by the arrow. 
Refer to the figure.
Take care not to damage it.

After operating the valve, be sure to tighten the valve cover
properly.

Check for refrigerant leakage after tightening the cap.

Cautions for handling service port

Always use a flexible charge hose with a push-rod and valve to
enable recovery of remaining refrigerant in the charge hose.

After the work, tighten the valve cover in place.
Tightening torque: 11.5~13.9 N•m

Precautions when connecting field piping and regarding 
insulation

Be careful not to let the indoor and outdoor branch piping come
into contact with the compressor terminal cover.
If the liquid-side piping insulation might come into contact with it,
adjust the height as shown in the figure below. Also, make sure
the field piping does not touch the bolts or outer panels of the
compressor.

When the outdoor unit is installed above the indoor unit the
following can occur:
The condensated water on the stop valve can move to the
indoor unit. To avoid this, please cover the stop valve with
sealing material.

If the temperature is higher than 30°C and the humidity is higher
than RH 80%, then the thickness of the sealing materials should
be at least 20 mm in order to avoid condensation on the surface
of the sealing.

Be sure to insulate the liquid and gas-side field piping and the
refrigerant branch kit.

(The highest temperature that the gas-side piping can reach is
around 120°C, so be sure to use insulating material which is
very resistant.)

Cautions for flare connection

Please refer to the table for the dimensions for processing flares
and for the tightening torques. (Too much tightening will end up
in splitting of the flare.)

1

Spanner

2

Torque wrench

Silicon sealing pad
(Make sure there is no gap)

 Closing direction

A

Liquid side

B

Gas side

Tightening torque

Liquid pipe

13.5~16.5 N•m

Gas pipe

22.5~27.5 N•m

2

A

B

Any exposed piping may cause condensation or burns
if touched.

Piping 

size

Flare nut 

tightening torque

A dimensions for 

processing flares 

(mm)

Flare shape

Ø6.4

15~17 N•m

8.7~9.1

Ø9.5

33~39 N•m

12.8~13.2

Ø12.7

50~60 N•m

16.2~16.6

Ø15.9

63~75 N•m

19.3~19.7

2

1

3

5

5

A

4

4

6

1

Compressor

2

Terminal cover

3

Indoor and outdoor 
field piping

4

Corking, etc.

5

Insulation material

6

Bolts

A

Be careful with pipe, 
bolt and outer panel 
connections

R=0.4~0.8

45

° ±

2

90

°±

2

A

Summary of Contents for RZQ71D7V1B

Page 1: ...INSTALLATION MANUAL RZQ71D7V1B RZQ71D2V1B RZQ100D7V1B RZQ125D7V1B RZQ140D7V1B RZQ100B8W1B RZQ125B8W1B RZQ140B8W1B Split System air conditioners...

Page 2: ...5 9 7 6 6 8 3 3 1 3 2 4 5 A B A E B C D H H1 L1 H1 H2 L3 L1 L2 H1 H2 L4 L1 L3 L2 H1 H2 L7 L1 L6 L5 L4 L3 L2 A A B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 A A B1 B1 B1 B1 B1 B1 B2...

Page 3: ...bestemmelsene i 13 noudattaen m r yksi 14 za dodr en ustanoven p edpisu 15 prema odredbama 16 k veti a z 17 zgodnie z postanowieniami Dyrektyw 18 n urma prevederilor 19 ob upo tevanju dolo b 20 vasta...

Page 4: ...ns or earthquakes Improper installation work may result in accidents due to fall of equipment Make certain that all electrical work is carried out by qualified personnel according to the local laws an...

Page 5: ...salt such as that near the ocean Where voltage fluctuates a lot such as that in factories In vehicles or vessels Where acidic or alkaline vapour is present Provide a logbook In accordance with the re...

Page 6: ...wind blows continuously on the face of the unit the fan can start rotating very fast until it breaks Refer to the figures for installation of this unit in a place where the wind direction can be fores...

Page 7: ...water may splash on people provide the drain piping using a drain socket optional Make sure the drain works properly INSTALLATION SERVICING SPACE The numerical figures used in here represent the dime...

Page 8: ...and international codes In Europe EN378 is the applicable standard that shall be used To persons in charge of piping work Be sure to open the stop valve after piping installing and vacuming is comple...

Page 9: ...te the room thoroughly right away Use R410A only when adding refrigerant Installation tools Make sure to use installation tools gauge manifold charge hose etc that are exclusively used for R410A insta...

Page 10: ...e effects If the indoor or outdoor units were disconnected from the piping for a long period of time water or dirt might have gotten into the piping If copper piping is corroded Flares should not be r...

Page 11: ...ions when connecting field piping and regarding insulation Be careful not to let the indoor and outdoor branch piping come into contact with the compressor terminal cover If the liquid side piping ins...

Page 12: ...y closed before leak test or vacuuming Set up for vacuuming and leak test see figure 8 Procedure for leak test Leak test must satisfy EN378 2 1 Evacuate the pipes and check vacuum 1 No pressure increa...

Page 13: ...amount is R1 R2 1 G1 total length of 9 5 mm liquid piping G2 total length of 6 4 mm liquid piping 2 a G1 30 m calculate length over 30 m G1 30 m Based on this length decide R1 R2 in the table b G1 30...

Page 14: ...ove and use the table below G1 total length of 12 7 mm liquid piping Length exceeding Chargeless length Model Liquid piping 0 5 m 5 10 m 10 15 m 15 20 m RZQ71 Main 12 7 0 5 1 0 RZQ100 140 Main 1 5 2 0...

Page 15: ...apacitor abnormal heating accident due to high frequency waves Therefore never install a phase advancing capacitor Secure the wiring in the order shown below 1 Secure the ground wire to the stop valve...

Page 16: ...e maximum values see electrical data of combination with indoor units for exact values 18 9 27 6 28 8 17 1 18 3 Recommended field fuse A 20 32 20 Wire type b b Only in protected pipes use H07RN F when...

Page 17: ...it decoration panel with infra red receiver first 5 In case the panels of indoor units are not yet installed to the indoor units make sure to shut off the power supply after finishing the complete tes...

Page 18: ...charge for V1 models only R3T Thermistor discharge pipe for W1 models only R3T Thermistor suction pipe for V1 models only R4T Thermistor suction pipe for W1 models only R4T Thermistor coil for V1 mode...

Page 19: ...NOTES NOTES...

Page 20: ...4PW48323 1B Copyright Daikin...

Reviews: