OUTDOOR UNIT INSTALLATION 

Install as described in the installation manual supplied with the outdoor unit.

REFRIGERANT PIPING WORK 

See the installation manual supplied with the outdoor unit.

1.

FLARING THE PIPE END

1) Cut the pipe end with a pipe cutter.
2) Remove burrs with the cut surface facing downward 

so that the chips do not enter the pipe.

3) Put the flare nut on the pipe.
4) Flare the pipe.
5) Check that the flaring is properly made.

Warning

Do not use mineral oil on flared part.
Prevent mineral oil from getting into the system as this would reduce the lifetime of the units.
Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.
Do never install a drier to this R410A unit in order to guarantee its lifetime.
The drying material may dissolve and damage the system.
Incomplete flaring may cause refrigerant gas leakage.

2.

REFRIGERANT PIPING

1) To prevent gas leakage, apply refrigeration machine oil on both 

inner and outer surfaces of the flare. (Use refrigeration oil for 
R410A)

2) Align the centres of both flares and tighten the flare nuts 3 or 4 

turns by hand. Then tighten them fully with the torque wrenches. 
• Use torque wrenches when tightening the flare nuts to prevent 

damage to the flare nuts and escaping gas.

Caution

Overtightening may damage the flare and cause leaks.

For heat pump: If your feet feel cold when using the heating function, it is

recommended that the air discharge grille shown at below be

attached.

(Adjustable angle)

45°

A

A

(Cut exactly at right angles.)

Remove burrs

Flare’s inner surface 
must be flaw-free.

The pipe end must 
be evenly flared in a 
perfect circle.

Make sure that the 
flare nut is fitted.

Check

0-0.5mm

1.0-1.5mm

1.5-2.0mm

Set exactly at the position shown below.

Clutch-type

Flare tool for R410A

Clutch-type (Rigid-type) Wing-nut type (Imperial-type)

Conventional flare tool

Flaring

Die

Flare nut tightening torque

Gas side

Liquid side

3/8 inch

1/2 inch

1/4 inch

32.7-39.9N•m

(333-407kgf•cm)

49.5-60.3N•m

(505-615kgf•cm)

14.2-17.2N•m

(144-175kgf•cm)

01_EN_3P132003-3K.fm  Page 6  Wednesday, September 28, 2005  3:32 PM

Summary of Contents for Super Multi NX FDKS25EAVMB

Page 1: ...s Espa ol Italiano Portugues T rk e Installation manual R410A Split series Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Ma...

Page 2: ...5 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 49...

Page 3: ...r installation may cause terminal overheating electrical shock or fire When installing or relocating the system be sure to keep the refrigerant circuit free from substances other than the specified re...

Page 4: ...conditions under which the electric wave is generated even if a one meter allowance is maintained Use suspension bolts to install the unit Check whether or not the ceiling is strong enough to support...

Page 5: ...ontrol box and drain pump are easy Install the inspection opening also in the lower part of the unit Make sure the range of the unit s external static pressure is not exceeded See the technical docume...

Page 6: ...re not covered by anti sweat material Make sure there are no gaps between the different pieces of sealing pad 4 Attach the hanger right insulation to the right hanger Stored in outlet vent See the bel...

Page 7: ...the unit to the surface of the water at both ends of the plastic tube and adjust the unit horizontally One thing to watch out for in particular is if it is installed so that the slope is not in the d...

Page 8: ...ent gas leakage apply refrigeration machine oil on both inner and outer surfaces of the flare Use refrigeration oil for R410A 2 Align the centres of both flares and tighten the flare nuts 3 or 4 turns...

Page 9: ...refrigerant piping the unit piping and branch piping must be further reinforced Reinforce the insulation when installing the unit near bathrooms kitchens and other similar locations Refer to the follo...

Page 10: ...ere causing water to leak Drain piping passing indoors Drain sockets Referring the figure below insulate the metal clamp and drain hose using the included large sealing pad PRECAUTIONS Drain piping co...

Page 11: ...ncy is at least 50 in a gravimetric technique Outlet side Connect the duct according to the inside of the outlet side flange Wrap the outlet side flange and the duct connection area with aluminum tape...

Page 12: ...rough the wiring through hole and connect to the power wiring terminal block 4P Be sure to put the part of the sheathed vinyl into the control box Warning Do not use tapped wires stand wires extension...

Page 13: ...If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off the power to the air...

Page 14: ...0511 HT 3P132003 3K M05B026A...

Reviews: