65 |
P a g e
8
SERVICE PROCEDURE
The proper maintenance prolongs service life and enhances performance of the
AC system.
The maintenance starts basically as the chiller starts. 3 to 4 weeks after the first
start-up, it must be overall inspected, followed by periodical maintenance.
DAIKIN provides diversified maintenance service according to different
customer needs.
★
The printing may deviate from the real products, please refer to the real object when purchasing.
★
All material is carefully reviewed. In case of any printing errors, DAIKIN bears no responsibility.
Models, parameters and performance may change due to product improvement without further
notification. Please refer to the nameplate for detail.
★
The manufacturer reserves the right to revise any of the specification and design contain herein at
any time without prior notice.
NOTE
For Chiller or Component (electrical & non-electrical) end-of-life disposal, in the interest of
the environment, please contact your local authority for disposal method and authorized
handling center.
While for Refrigerant Recovering and Disposal, please contact the local Daikin Service Team
or your local authority for disposal method and authorized handling center.
Summary of Contents for UAA-ST3M
Page 2: ......
Page 17: ...13 P a g e UAA 105 UAA 150 UAA175 UAA220 UAA204 220...
Page 18: ...14 P a g e Figure 7 Hanging Method UAA245 UAA348 UAA380 UAA450...
Page 42: ......
Page 44: ......