15 Piping installation
Installation and operation manual
31
REMA5+REYA8~20A7Y1B
VRV 5 heat recovery
4P684060-1 – 2022.02
If
Then
>2 m
a
≤2 m
≥200 mm
b
>2 m
a
To indoor unit
b
Piping between outdoor units
NOTICE
There are restrictions on the refrigerant pipe connection
order between outdoor units during installation in case of a
multiple outdoor unit system. Install according to following
restrictions. The capacities of outdoor units A and B must
fulfill the following restriction conditions: A≥B.
A
B
a b
a
To indoor units
b
Outdoor unit multi connecting piping kit (first branch)
15.2
Connecting the refrigerant piping
15.2.1
To route the refrigerant piping
Installation of refrigerant piping is possible as front connection or
side connection (when taken out from the bottom) as shown in the
figure below.
a
b
c
a
Left-side connection
b
Front connection
c
Right-side connection
For side connections, the knockout hole on the bottom plate should
be removed:
c
b
a
a
Large knockout hole
b
Drill
c
Points for drilling
NOTICE
Precautions when making knockout holes:
▪ Avoid damaging the casing.
▪ After making the knockout holes, we recommend you
remove the burrs and paint the edges and areas
around the edges using repair paint to prevent rusting.
▪ When passing electrical wiring through the knockout
holes, wrap the wiring with protective tape to prevent
damage.
15.2.2
To connect the refrigerant piping to the
outdoor unit
NOTICE
▪ Be sure to use the supplied accessory pipes when
carrying out piping work in the field.
▪ Be sure that the field installed piping does not touch
other pipes, the bottom panel or side panel. Especially
for the bottom and side connection, be sure to protect
the piping with suitable insulation, to prevent it from
coming into contact with the casing.
Connect the stop valves to the field piping using the accessory pipes
supplied with the unit.
The connections to the branch kits are the responsibility of the
installer (field piping).
15.2.3
To connect the multi connection piping kit
NOTICE
Improper installation may lead to malfunction of the
outdoor unit.
▪ Install the joints horizontally, so that the caution label (a) attached
to the joint comes to the top.
▪ Do not tilt the joint more than 7.5° (see view A).
▪ Do not install the joint vertically (see view B).
a
a
A
B
7.5°
7.5°
a
Caution label
NOT allowed
Allowed
▪ Make sure that the total length of the piping connected to the joint
is absolute straight for more than 500 mm. Only if a straight field
piping of more than 120 mm is connected, more than 500 mm of
straight section can be ensured.
>120 mm
>500 mm
15.2.4
To connect the refrigerant branching kit
For installation of the refrigerant branching kit, refer to the installation