SiBE37-701
Test Operation
Test Operation
155
1.2
Procedure and Outline
Follow the following procedure to conduct the initial test operation after installation.
1.2.1 Check Work Prior to Turn Power Supply On
Check on refrigerant piping /
insulation materials
Check airtight test and vacuum
drying.
Terminal
Dryer
(1000W)
Check the below items.
2
Power wiring
2
Control transmission wiring
between units
2
Earth wire
Is the wiring performed as specified?
Is the designated wire used?
Is the wiring screw of wiring not loose?
Is the grounding work completed?
Is the insulation of the main power supply circuit deteriorated?
Use a 500V megger tester to measure the insulation. (*1)
2
Do not use a megger tester for other circuits than 200V (or
240V) circuit.
*1:Measure to be taken against decreased insulation resistance in
the compressor
If the compressor is left to stand for
an extended period of time after the
refrigerant charge with the stop valve
open and the power supply OFF, the
refrigerant may be mixed in the
compressor, thus decreasing the
insulation resistance.
Heat the compressor as shown on
the right and then recheck the
insulation.
Is the pipe size proper?
Are the design pressures for the liquid pipe, suction pipe, dual
pressure gas pipe, and pressure equalizer pipe (in case of multi
units) all not less than 4.0 MPa?
Is the pipe insulation material installed securely?
Liquid, suction and high & low pressure gas pipe need to be
insulated. (Otherwise causes water leak.)
Have the airtight test and the vacuum drying been conducted
according to the procedure in the Installation Manual?
Summary of Contents for VRV III REYQ10PY1B
Page 1: ...REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701 ...
Page 111: ...Refrigerant Flow for Each Operation Mode SiBE37 701 100 Refrigerant Circuit ...
Page 252: ...SiBE37 701 Troubleshooting by Remote Controller Troubleshooting 241 ...
Page 396: ...SiBE37 701 Piping Diagrams Appendix 385 REYQ14P 16P 3D058153B S2NPL S1NPH ...
Page 397: ...Piping Diagrams SiBE37 701 386 Appendix REMQ8P 3D057743 ...
Page 398: ...SiBE37 701 Piping Diagrams Appendix 387 REMQ10P 12P 3D057742 ...
Page 399: ...Piping Diagrams SiBE37 701 388 Appendix REMQ14P 16P 3D057741 ...
Page 400: ...SiBE37 701 Piping Diagrams Appendix 389 1 2 Indoor Unit FXFQ P ...
Page 405: ...Piping Diagrams SiBE37 701 394 Appendix 1 3 BS Unit 4D057985A ...
Page 415: ...Wiring Diagrams for Reference SiBE37 701 404 Appendix FXZQ20M 25M 32M 40M 50MV1 ...
Page 416: ...SiBE37 701 Wiring Diagrams for Reference Appendix 405 FXCQ20M 25M 32M 63MV3 ...
Page 417: ...Wiring Diagrams for Reference SiBE37 701 406 Appendix FXCQ40M 50M 80M 125MV3 ...
Page 420: ...SiBE37 701 Wiring Diagrams for Reference Appendix 409 FXDQ20M 25MV3 ...
Page 421: ...Wiring Diagrams for Reference SiBE37 701 410 Appendix FXSQ20M 25M 32M 40M 50M 63MV3 ...
Page 422: ...SiBE37 701 Wiring Diagrams for Reference Appendix 411 FXSQ80M 100M 125MV3 ...
Page 447: ...Example of connection SiBE37 701 436 Appendix ...
Page 453: ...Method of Checking the Inverter s Power Transistors and Diode Modules SiBE37 701 442 Appendix ...