Test Operation
SiBE37-701
172
Test Operation
1.2.5.3
Procedure for Additional Refrigerant Charge and Check operation
- REYQ18~48P7Y1B (REMQ8~16P7Y1B)
Adding refrigerant using the automatic refrigerant charging function is recommended.
Follow the procedures below.
When charging a system, charging over the permissible quantity can cause liquid hammer.
Always use protective gloves and protect your eyes when charging refrigerant.
When the refrigerant charging procedure is done or when pausing, close the valve of the
refrigerant tank immediately.
- The refrigerant charge port has a electric expansion valve and will be closed at the end of
the refrigerant charging. However, the valve will be opened when operating the unit after
refrigerant charging.
- If the tank is left with the valve open, the amount of refrigerant which is properly charged
may get off point. More refrigerant may be charged by any remaining pressure after the
unit has stopped.
Electric shock warning
Close the electric component box lid before turning on the main power.
Perform the settings on the circuit board (A1P) of the outdoor unit and check the LED display
after the power is on via the service lid which is in the lid of the electric component box.
Operate switches with an insulated stick (such as a ball-point pen)
to avoid touching the life parts.
Make sure to re-attach the inspection cover into the switch box cover
after the job is finished.
If the power of some units is turned off, the charging procedure can not be finished properly.
Make sure to turn ON the power 6 hours before starting the operation. This is necessary to
warm the crankcase by the electric heater.
If operation is performed within 12 minutes after the indoor units, BS units and outdoor unit
are turned on, the H2P-LED will be lit and the compressor will not operate.
Note:
See "Stop valve operation procedure" on page 163 for details on how to handle stop valves.
The refrigerant charging port is connected to the piping inside the unit.
The unit’s internal piping is already factory charged with refrigerant, so be careful when
connecting the charge hose.
After adding the refrigerant, do not forget to close the lid of the refrigerant charging port.
The tightening torque for the lid is 11.5 to 13.9 N · m.
In order to ensure uniform refrigerant distribution, it may take the compressor ±10 minutes to
start up after the unit has started operation. This is not a malfunction.
Summary of Contents for VRV III REYQ10PY1B
Page 1: ...REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701 ...
Page 111: ...Refrigerant Flow for Each Operation Mode SiBE37 701 100 Refrigerant Circuit ...
Page 252: ...SiBE37 701 Troubleshooting by Remote Controller Troubleshooting 241 ...
Page 396: ...SiBE37 701 Piping Diagrams Appendix 385 REYQ14P 16P 3D058153B S2NPL S1NPH ...
Page 397: ...Piping Diagrams SiBE37 701 386 Appendix REMQ8P 3D057743 ...
Page 398: ...SiBE37 701 Piping Diagrams Appendix 387 REMQ10P 12P 3D057742 ...
Page 399: ...Piping Diagrams SiBE37 701 388 Appendix REMQ14P 16P 3D057741 ...
Page 400: ...SiBE37 701 Piping Diagrams Appendix 389 1 2 Indoor Unit FXFQ P ...
Page 405: ...Piping Diagrams SiBE37 701 394 Appendix 1 3 BS Unit 4D057985A ...
Page 415: ...Wiring Diagrams for Reference SiBE37 701 404 Appendix FXZQ20M 25M 32M 40M 50MV1 ...
Page 416: ...SiBE37 701 Wiring Diagrams for Reference Appendix 405 FXCQ20M 25M 32M 63MV3 ...
Page 417: ...Wiring Diagrams for Reference SiBE37 701 406 Appendix FXCQ40M 50M 80M 125MV3 ...
Page 420: ...SiBE37 701 Wiring Diagrams for Reference Appendix 409 FXDQ20M 25MV3 ...
Page 421: ...Wiring Diagrams for Reference SiBE37 701 410 Appendix FXSQ20M 25M 32M 40M 50M 63MV3 ...
Page 422: ...SiBE37 701 Wiring Diagrams for Reference Appendix 411 FXSQ80M 100M 125MV3 ...
Page 447: ...Example of connection SiBE37 701 436 Appendix ...
Page 453: ...Method of Checking the Inverter s Power Transistors and Diode Modules SiBE37 701 442 Appendix ...
Page 467: ...SiBE37 701 iv Index ...