3
|
Components
Service manual
240
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
3.6 E-bridge
3.6.1 Checking procedures
To perform a functional check of the E-bridge
NOTICE
Below check procedure will only be relevant if indoor units are in cooling mode with
high load condition (Y4S and Y5S MUST be OFF).
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
315].
1
Turn ON the power of the unit.
2
Force the indoor unit into cooling mode with high load condition.
3
Check liquid pressure by a manifold on liquid stop valve.
4
Check discharge pressure using the service monitoring tool or field setting
mode 1-42. Make sure the refrigerant high pressure sensor is operating
correctly. See
330].
5
Check R3T, R4T, R5T and R7T thermistor read-outs. Check thermistor read-
outs using the service monitoring tool. Make sure all thermistors are
operating normally. See
b
a
d
c
a
Non-return valve a
b
Non-return valve b
c
Non-return valve c
d
Non-return valve d