Is the correct spare part for the fan
inverter PCB installed?
Action
No
Replace the fan inverter PCB, see
To check the wiring of the fan inverter PCB
Prerequisite:
First perform all earlier checks of the fan inverter PCB, see
259].
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Check that all wires are properly connected and that all connectors are fully
plugged‑in.
2
Check that no connectors or wires are damaged.
3
Check that the wiring corresponds with the wiring diagram, see
INFORMATION
Correct the wiring as needed.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to
259] of the fan inverter
PCB and continue with the next
procedure.
To check the fuse of the fan inverter PCB
Prerequisite:
First perform all earlier checks of the fan inverter PCB, see
259].
1
Measure the continuity of the fuse. If no continuity is measured, the fuse has
blown.
a
a
Fuse
Blown fuse on the fan inverter PCB?
Action
Yes
Replace the fan inverter PCB, see
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...