3
|
Components
Service manual
287
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
f
b
f
d
a
b
b
b
c
e
d
f
f
g
g
a
Power terminal assembly
b
Screw
c
Heat sink
d
Inverter PCB
e
Compressor cable
f
Screw
g
Screw
6
Put the compressor inverter PCB assembly (d) in vertical position.
7
Install the 4 screws (b) that fix the heat sink (c).
8
Turn the power terminal assembly (a) to the right.
h
g
f
e
a
c
b
d
e
a
Flat screwdriver
b
Heat pipe
c
Heat sink
d
Screw
e
Power terminal assembly
f
Connector X3
g
Connector X5
h
Fan inverter PCB
9
Connect connectors X3 (f) and X5 (g) from to fan inverter PCB (h).
10
Move the power terminal assembly (e) to the left.
11
Install the screw (d) to fix the power terminal assembly (e).
12
Install the heat pipe (b) on the heat sink (c).
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...