3
|
Components
Service manual
288
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
a
g
b
c
h
d
f
e
g
j
i
k
k
l
m
n
a
Screw
b
Cable clamp
c
Tie wrap
d
Tie wrap
e
Cables
f
Cables
g
Screw
h
Compressor inverter assembly
i
Screw
j
Thermistor clamp
k
Screw
l
Heat pipe
m
Ground wire
n
Screw
13
Install the screw (n) to fix the ground wire (m).
14
Install the 2 screws (k) to fix the heat pipe (l).
15
Install the screw (i) to fix the thermistor clamp (j).
16
Install the 2 screws (g) to fix the compressor inverter assembly (h).
17
Tie the cables (e) and (f) together with tie wraps (c, d).
18
Install the screw (a) to fix the cable clamp (b).
g
a
a
b
d
c
d
c
e
f
a
Screw
b
Power terminal assembly
c
Screw
d
Cable clamp
e
Connectors X1A and X2A
f
Wiring
g
Tie wrap
19
Install the tie wrap (g).
20
Connect the wiring (f) to the main board.
21
Connect the fan connectors X1A and X2A (e).
22
Install the 2 screws (c) to fix the cable clamps (d).
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...