3
|
Components
Service manual
294
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
315].
a
a
Cable clamp
2
Unlatch the cable clamp at the top right corner of the main PCB to facilitate
the removal of the PCB.
b
a
a
a
a
a
a
a
a
a
c
c
c
c
c
c
c
c
a
Connector
b
Wire terminal
c
PCB support
3
Disconnect all connectors from the main PCB assembly.
4
Note the field wiring on X1M transmission field wiring terminals.
5
Disconnect wiring connections on wiring terminals.
6
Carefully pull the PCB at the side and unlatch the PCB supports one by one
using a small pair of pliers.
7
Remove the main PCB.
8
To install the new outdoor unit main PCB, see
To install the main PCB
1
Install the main PCB on its correct location.
2
Latch the PCB supports to fix the PCB.
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...