REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
To perform an electrical check of the oil return valve
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
Unplug the oil return valve connector from the appropriate PCB.
2
Measure the resistance of the oil return valve coil.
Result:
The measured value MUST be 2.1 kΩ ± 5%.
Name
Symbol
Location
(PCB)
Connector
Winding resistance
(kΩ)
5+8 10+
12
14+
16
18+
20
Oil return
valve M1C
Y11S
A1P
X7A
2.1
Oil Return
Valve M2C
Y12S
A1P
X8A
-
-
2.1
Is the measured value correct?
Action
Yes
Continue with the next step.
No
Replace the oil return valve coil, see
304].
For the Y11S and Y12S valves
3
Turn ON the power using the respective circuit breaker.
4
Turn ON an indoor unit via remote controller or central controller.
5
Measure the voltage on the Y11S or Y12S valve connection on the PCB.
Result:
The measured voltage MUST be 0 V AC. Y11S and Y12S are NOT
energized when compressor is OFF and the pressure difference between the
high and low pressure <0,3 MPa.
6
Connect the service monitoring tool to the unit and check the pressure
difference between the high and low pressure. Once the pressure difference
between the high and low pressure exceeds 0,3 MPa and the compressor is
running, Y11S and Y12S are energized.
7
With the Y11S/Y12S valve connector connected to the PCB, measure the
voltage on the Y11S /Y12S valve connection of the PCB.
Result:
The measured voltage MUST be 230 V AC.
Are the measured voltages correct?
Action
Yes
Perform a position check of the oil
return valve, see
302].
No
Check the main PCB, see
290].
To perform a position check of the oil return valve
1
Turn ON the power using the respective circuit breaker.
2
Turn ON an indoor unit via remote controller or central controller.