3
|
Components
Service manual
343
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
2
Measure the voltage on connector X1A of the Sub PCB. The voltage MUST be
230 V AC±10%.
a
a
Connector X1A
Does the Sub PCB receive power?
Action
Yes
Return to
342] of the sub PCB and
continue with the next procedure.
No
Continue with the next step.
3
Check the power supply to the unit, see
356].
Does the Unit receive power?
Action
Yes
Correct the wiring from the main power
supply terminal to the Sub PCB, see
345].
No
Adjust the power supply to the unit, see
To check the HAP LED of the Sub PCB
Prerequisite:
First perform a power check of the Sub PCB, see
342].
1
Locate the HAP LED on the Sub PCB.
a
a
HAP LED
Does the HAP LED blink in regular
intervals (approximately 1 Hz)?
Action
Yes
Return to
342] of the Sub PCB and
continue with the next procedure.
No
345].
To check if the correct spare part is installed
Prerequisite:
First perform all earlier checks of the Sub PCB, see
342].
1
Visit your local spare parts webbank.
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...