5
|
Maintenance
Service manual
375
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
5.2 Maintenance procedures for outdoor units
5.2.1 To check the general status of the unit
Prerequisite:
Switch off all the indoor units.
Prerequisite:
Stop the unit operation (via the central controller).
1
Turn OFF the respective circuit breaker.
DANGER: RISK OF ELECTROCUTION
Confirm the rectifier voltage is below 10 V DC before proceeding, see
356].
2
"5.2.2 To clean the cover plates"
376].
3
Check if any other equipment interferes with the operation of the outdoor
unit (other device exhaust to outdoor unit heat exchanger, chimney exhaust
to outdoor unit, corrosive or explosive ambient, electrical equipment such as
antennas, GSM towers, etc…). Refer to the installation manual.
4
Make sure that there is sufficient air flow or no air by-pass on outdoor unit
heat exchanger in cooling mode. Refer to installation manual for required
space. Even after outdoor unit heat exchanger is cleaned by maintenance, if
difference between ambient temperature and air inlet of outdoor unit heat
exchanger is 5K or more, consider mounting an air guide at air discharge
outlet of the outdoor unit.
5
Prior to cleaning, check for oil drips on the bottom plate. If found, check
system for signs of refrigerant shortage, check possible leaking points and
repair when necessary. Refer to Repair instructions of the component when
necessary.
6
Clean the bottom plate.
7
Clean the inside of the unit.
NOTICE
To clean the inside of the unit:
▪
Use water or compressed air, not warmer than 50° C.
▪
Do not use any cleaning agents or chemicals.
▪
Do not use pressurized water.
8
Check the general status inside the cover plates.
9
Check the visual appearance of all the components, including PCBs. Refer to
component check methods if any irregularity is found.
10
Check the electrical connections. Tighten and secure the connections when
necessary.
11
Check if power supply is in conform with legislation. See
power supply is conform with the regulations"
12
Check and tighten the power supply wiring on the dedicated terminal.
13
Check insulation on piping and refrigerant branches. Replace or fix insulation
where necessary.
14
Make sure that the water drain works properly and is not clogged or does not
cause any accumulation of water.
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...