6.4.3 To route the refrigerant piping
Installation of refrigerant piping is possible as front connection or side connection
(when taken out from the bottom) as shown in the figure below.
a
b
c
a
Left-side connection
b
Front connection
c
Right-side connection
For side connections, the knockout hole on the bottom plate should be removed:
c
b
a
a
Large knockout hole
b
Drill
c
Points for drilling
NOTICE
Precautions when making knockout holes:
▪
Avoid damaging the casing.
▪
After making the knockout holes, we recommend you remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
▪
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
6.4.4 To connect the refrigerant piping to the outdoor unit
INFORMATION
All local inter unit piping are field supplied except the accessory pipes.
NOTICE
Precautions when connecting field piping. Add brazing material as shown in the
figure.
1
1
1
1
2
2
≤Ø25.4
>Ø25.4
Summary of Contents for VRV IV+
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ...4P546228 1A 2019 10 Copyright 2018 Daikin Verantwortung für Energie und Umwelt ...