3
|
Components
Service manual
206
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
3 Components
3.1 4-way valve
3.1.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a mechanical check of the 4-way valve
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
315].
1
Verify that the screw is firmly fixing the coil to the valve body.
2
Check if any damage or burst is present.
Is the 4‑way valve coil firmly fixed and
not visually damaged?
Action
Yes
Perform an electrical check of the 4‑way
valve, see
No
Fix or replace the 4‑way valve coil, see
211].
To perform an electrical check of the 4-way valve
Prerequisite:
First perform a mechanical check of the 4-way valve, see
206].
1
Unplug the 4-way valve connector from the appropriate PCB.
2
Measure the resistance of the 4-way valve coil between the pins of the 4-way
valve connector.
Result:
The measured value must be as indicated in the table below ± 5%.
Name
Symbol
Location
(PCB)
Connector
Winding resistance
(kΩ)
5+8 10+
12
14+
16
18+
20
High
pressure/low
pressure 4-
way valve
Y3S
A1P
X13A
1.5
1.36
Lower heat
exchanger 4-
way valve
Y4S
A1P
X16A
1.5
1.3
6
Upper heat
exchanger 4-
way valve
Y5S
A1P
X17A
1.5
Summary of Contents for VRV IV+