3.3 Compressor
3.3.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform an auditive check of the compressor
Prerequisite:
First perform a power transistor check of the inverter PCB, see
274]. If power transistor is OK, proceed as follows:
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see