3
|
Components
Service manual
328
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
3.16 Reactor
3.16.1 Checking procedures
To perform an electrical check of the reactor
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
315].
2
Access the switch box, see
a
a
c
a
c
c
c
b
b
c
c
c
c
a
Screw
b
Faston connector
c
Screw
3
Check the connections of the reactor on the inverter PCB('s), see
385].
4
Remove the wiring or Faston connectors from the reactor.
5
Using a megger device of 500 V DC, check the insulation resistance. Make sure
there is no earth leakage.
Is the measured insulation resistance
correct?
Action
Yes
Continue with the next step.
No
Replace the reactor, see
6
Measure the continuity of the reactor.
Is the continuity measurement correct? Action
Yes
Return to the troubleshooting of the
specific error and continue with the
next step.
No
Replace the reactor, see
3.16.2 Repair procedures
To remove the reactor
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
315].
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...