4
|
Third party components
Service manual
363
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
2
Push BS3 (RETURN) and hold it for 5 seconds until the 7-segment display
shows "000". Then release BS3.
Result:
After a while, voltage will drop to almost 0 V DC. At this stage it means
that re-initialization has started.
Result:
Depending on the system size, voltage will rise to 16 V DC and hit 0 V
back again several times.
Result:
When finished, 7‑Segment Display will turn OFF. This indicates that re-
initialization has completed.
The time this procedure takes, depends on the amount of indoor units.
To adjust the wiring between the outdoor units
1
Adjust the wiring according to the wiring diagram and connection diagram,
see
2
Check that all wires are properly connected.
3
Check that no wires are damaged.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
4.2 Refrigerant circuit
4.2.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To check if the stop valves are open
Prerequisite:
Remove the required plate work, see
1
Remove the caps.
b
c
a
a
Liquid stop valve
b
Suction gas stop valve
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...