Test Operation
SiE-05C
286
Test Operation PLUS Series
1.6
Sequential Start
Separates path timing of commercial power supply compressors by 3 seconds each in order to prevent
overcurrent when more than 1 compressor are to be started at the same time.
Improved wiring system enables sequential start of up to 5 function units and 10 outdoor units.
If you want to carry out sequential start, connect outdoor unit - outdoor unit transmission wiring as shown
below.
The function unit PC board (EC) is factory set to “sequential start.”
Part7.fm Page 286 Wednesday, January 31, 2001 9:06 AM
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html