Test Operation
SiE-05C
82
Test Operation Inverter K Series
Remote Control
Forced OFF or ON/OFF control of indoor units can be input from outside.
Enables indoor units to be turned on and off by a building control or key control system.
1. Wiring method and specifications
Remote control is carried out by connecting input from outside to pins T1 and T2 on the terminal block (for
remote controller and transmission wiring)
2. Operation contents
Input A of forced stop and stop operation operates as described in the table on the right.
3. Forced OFF and ON/OFF control selection
Switch input by remote controller after turning on the power supply.
Set field setting mode with the remote controller.
When you enter the field setting mode, select mode No. 12, and set the first code No. to “1.” for forced
OFF, set the second code No. to “01,” and from ON/OFF control, set to “02.” (Factory set is forced
OFF.)
Wiring specifications
Sheathed vinyl cord or cable (double core)
Wiring thickness
0.75~1.25mm
²
Wiring length
MAX 100m
Outside contact specs.
Contact which guarantees min. applicable load of 15 VDC, 10 mA
Forced OFF
ON/OFF control
Forced OFF by input A “ON” (remote controller prohibited)
On by input A “OFF”
→
“ON”
Remote controller permitted by input A “OFF”
OFF by input A “ON”
→
“OFF”
SI-05C.BOOK Page 82 Monday, November 6, 2000 4:13 PM
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html