SiE33-102
Refrigerant Piping
Installation Manual
143
6.3
Connecting the Refrigerant Piping
1. Piping
Installation
Installation of refrigerant piping is possible as front connection, side connection and bottom connection.
Caution
Be sure to use the attached pipe when carrying out piping work in the field.
Separately use the optional “KHF30A30L” or “KHF30A30U” piping kit when carrying out connections for
the side and bottom on RSXY24, 26, 28, and 30.
Connect the flange on the valve on the gas side before connecting the flare nut on the valve on the
liquid side.
(Connecting the liquid side first will make it harder to connect the gas side.)
Be sure that the local piping does not touch other pipes, the bottom panel or side panel. Especially
for the bottom and side connection, be sure to protect the gas piping with the provided insulation,
to prevent it from coming into contact with the casing.
Notes:
1. Front Connection
Make sure to close the piping intake hole again after installation work.
Stop valve cover
2. Side Connection
Use a hammer and knock out the hole.
Piping kit “KHF30A30L” is required for RSXY24,26,28 and 30.
Refer the optional “KHF30A30L” or “KHF30A30U” piping kit on page 107 for more detail.
Flange
Liquid side pipe
(Field supply)
Brazing
Gas side
attached
pipe
Flare nut
RSXY16,18,20
Flange
Liquid side pipe
(Field supply)
Flare nut
Knock out hole
(Use a hammer)
Brazing
Gas side
attached
pipe
Gas side pipe
(Field supply)
Flange
Flare nut
Elbow(Field supply)
Liquid side pipe
(Field supply)
Knock out hole
(Use a hammer)
brazing
Gas side
attached
pipe
Gas side pipe
(Field supply)
(V1839)
Flange
Flare nut
Gas side
attached
pipe
Liquid side attached pipe
(Field supply,in case
of RSXY24)
RSXY24,26,28,30
Brazing
Brazing
Knock out hole
(Use a hammer)
Flare nut
Gas side
optional
pipe
Gas side
optional
pipe
Liquid side optional pipe
(Field supply,in case of
RSXY24)
Liquid side optional pipe
(Field supply,in case of
RSXY24)
Flange
Flange
Gas side
optional
pipe
Gas side
optional
pipe
Flare nut
Liquid side optional pipe
(Field supply,in case of
RSXY24)
Brazing
Knock out hole
(Use a hammer)
(V1840)
RSXY16,18,20
Part to cut off
(Cut off the slit part.)
RSXY24,26,28,30
Part to cut off
(Cut grooves on
the back side.)
(V1841)
Si33-102.book Page 143 Tuesday, June 26, 2001 3:18 PM
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html