SiE33-102
Refrigerant Piping
Installation Manual
147
The pressure regulator for the nitrogen released when doing the brazing should be set to 0.02 MPa (0.2
kg/cm
²
) or less.
6. Protection
against
Contamination
when Installing
Pipes
Take measures to prevent foreign materials like moisture and contamination from mixing into the
system.
Great caution is needed when passing copper tubes through walls.
Refrigerant piping
Location to be brazed
Taping
Manual
valve
Regulator
Nitrogen
Nitrogen
(V1849)
Place
Installation Period
Protection Method
Outdoor
More than a month
Pinch the pipe
Less than a month
Pinch or tape the pipe
Indoor
Regardless of the period
Si33-102.book Page 147 Tuesday, June 26, 2001 3:18 PM
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html