SiE33-102
Drawings & Flow Charts
iii
Drawings & Flow Charts
Symbols
“88” cannot be cleared from the central remote
control
...........................................................124
A
Additional Charge of Refrigerant
Operational steps
............................................34
Additional Refrigerant Charge
..............................150
Air Tight Test
Checking for Leaks
..........................................28
Compensating adjustment value
.....................27
Operational steps
............................................27
Air Tight Test and Vacuum Drying
.......................148
Allowable Piping Length
.........................................97
B
Brazing
...................................................................21
C
Calibration method
.................................................31
Caution for Refrigerant Leaks
................................93
Centralized Control Group No. Setting
BRC1A51·52
....................................................89
BRC7A Type
....................................................89
BRC7C (4C) Type
...........................................90
Group No. Setting Example
.............................90
Check points
............................................................9
Choice of Materials for Refrigerant Piping
.............19
Coat the flange sheet surface with refrigeration oil
25
Coat the inner and outer surface
of the flare with refrigerator oil
........................22
Connect the reducers to the branch piping kit,
KHRP26K75T
...............................................106
Connecting the Refrigerant Piping
Bottom Connection
........................................144
Front Connection
...........................................143
Piping between Main Unit (RXY-) and
Sub Unit (RXE-)
................................145
Piping Installation
..........................................143
REFNET Joint
................................................145
Refrigerant Pipe Flushing
..............................146
Contents of Control Modes
How to Select Operation Mode
........................91
Contract Drawing
.....................................................9
Control circuit diagram
...........................................11
Cool / Heat Mode Selection
Setting Method
................................................76
Setting of Cool / Heat by Individual Outdoor Unit
System by Cool/Heat Selector
............73
Setting of Cool / Heat by Individual Outdoor
Unit System by Indoor Unit Remote
Control
................................................72
Setting of Cool / Heat by Outdoor Unit System
Group in Accordance
with Group Master Outdoor Unit
by Indoor Unit Remote Control
.......... 74
Supplement
..................................................... 75
Correlation of nozzle tip and
size of refrigeration piping
.............................. 20
Covering of Refrigerant Pipes
Particular care
................................................. 17
Pinching method
............................................. 17
Taping method
................................................ 17
Cracks develop in field pipes due to thermal
expansion and contraction
........................... 123
D
Dealing with situations where the result exceeds
the dangerous concentration level
................. 95
Degree of vacuum
................................................. 30
Demand Control System Example
........................ 78
Drain pipe trap shape defective
.......................... 120
Drain Pipe Work (Indoor)
Drain Pipe Gradient and Support
.................... 34
Drain Trap
....................................................... 35
Grouped Drain Piping
..................................... 35
Operational steps
............................................ 34
Use of an Auxiliary Drain Hose (Flexible)
....... 36
Duct Work (Indoor)
Operational steps
............................................ 54
Taking Account of Noise and Vibration
........... 54
E
Electrical Work
a PCB for remote control, multiple core cable
must not be used
............................... 52
Choosing a circuit breaker
.............................. 52
Earthing
.......................................................... 54
When cable more than 1.25 mm
²
is used
....... 52
Example of Connection
....................................... 169
Example of Performing Cool/Heat Setting of Two
or More Outdoor Units in Block
with Cool/Heat Selector
............................... 160
Example of Performing Cool/Heat
with Cool/Heat Selector
............................... 160
Example of refrigerant branch using REFNET
header for RSXY28
...................................... 102
Example of refrigerant branch using REFNET joint
and REFNET header for RSXY28
............... 102
Example of refrigerant branch using REFNET joint
for RSXY28
.................................................. 102
Excessive noise due to incorrect angling of
REFNET joints
............................................. 122
F
Field Line Connection
......................................... 157
Field Line Connection between Main Unit (RXY-)
and Sub Unit (RXE-)
.................................... 158
Flare Connection
................................................... 22
Flaring Procedure
.................................................. 23
Si33-102.book Page iii Tuesday, June 26, 2001 3:18 PM
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html