After inspection, an accurate and reliable written re-
port should be provided for each container inspected.
Place an inspection label stating the inspection date
and inspecting agency identification on each con-
tainer.
05/04/2010
f470558
6
7
8
9
10
11
12
13
14
1
2
3
4
5
1.
Coolant Inlet Port
2.
Coolant Outlet Port
3.
Pressure Relief Valve
4.
Pressure Regulator
5.
Wiring Harness
6.
Manifold Bleed Valve
7.
Manifold
8.
Manual Fuel Shutoff
Valve
9.
Fuel Fill Port
10. Filter Housing
11. Filter Bowl
12. Filter Drain Plug
13. Solenoid Valve
14. Fuel Line To Cylinders
Fig. 11, CNG Fuel Panel Components
Fuel
47
Business Class M2 Maintenance Manual, August 2015
47/11
Property of American Airlines