4. Load Tolerance of Building
The site of installation requires a floor load tolerance of at least 4010 N/m
2
(410 kgf/
m
2
) . To prevent the formation of cracks in the floor, it is recommended that the
adjuster foot of the PT-R rest on the framework of the building; however, the load on
the floor will vary depending on the strength of the floor, the position of the
framework, the positioning of the PT-R, and the presence of other heavy objects in
the same location. Consult with the designer of the building or other authority.
5. Ground Connections
• In order to prevent electrical shock accidents from the AC power supply, perform
grounding connections for the machine only after making sure that the PT-R power
switch and the building side power switch are both off.
• Since the leakage current of the PT-R is max. 3.5 mA, be sure to conduct grounding
before connecting the power line of the PT-R 3-line cable.
Have a qualified electrician select the above items and perform the connections.
6. Power Supply and Power Cables
• Have electrical work performed by a qualified electrician.
• Make arrangements to obtain the power supply indicated in Chapter 9, “Technical
Information.”
• PT-R power is supplied independently from the building side power switch,
therefore do not connect other devices to that power switch.
• The allowed range of voltage fluctuation in 200 V-240 V power supply areas is
+6%, -10%. If fluctuations in the power supply are greater than this, use a
stabilizer.
• A power cable is not provided with products sold outside of Japan. For the PT-R,
please obtain an 2.5 mm
2
×
3-wire power supply cable that complies with the
standards of your country and is rated at 300 V AC or higher.
If the cable described above does not comply to the standards of the country of
installation, please refer to the power supply nameplate attached to the PT-R and
provide a cable locally that does comply.
CAUTION
!
A readily accessible disconnection device (building side power switch)
must be installed in the fixed building wiring before installing the PT-R.
End of Chapter 2
Summary of Contents for PLATE RITE 4300
Page 10: ...x...
Page 11: ...Chapter 1 Ensuring Safety 1 This chapter gives information necessary for safe use of the PT R...
Page 26: ...PT R4300 USERS MANUAL 1 16 End of Chapter 1...
Page 38: ...PT R4300 USERS MANUAL 3 8 End of Chapter 3...
Page 39: ...This chapter explains the basic procedures for operating the PT R Chapter 4 Basic Operation 4...
Page 60: ...PT R4300 USERS MANUAL 4 22 End of Chapter 4...
Page 61: ...This chapter explains the procedures for setting PT R parameters Chapter 5 User Menu 5...
Page 122: ...PT R4300 USERS MANUAL 5 62 End of Chapter 5...
Page 157: ...This chapter explains this typical PT R problem and the solutions Chapter 8 Jamming 8...
Page 163: ...This chapter gives technical information on the PT R Chapter 9 Technical Information 9...