background image

(WA100-PM)

Daintree

®

  

Wireless Adapter

BEFORE YOU BEGIN 

Read these instructions completely and carefully.

Save these instructions for future use.

1

Installation Process

Installation Guide 

WA100-PM  |  DT113

1. Disconnect power before installation.

 Turn off all power 

  to affected light fixtures by turning off circuit breakers.  

 

  Confirm that power is off at all light fixtures before 

  continuing installation.

2.

 Set the WA100-PM DIP switches to support the device(s)

  being connected to it. See 

DIP Switch Settings 

(page 2).

3.

 

IMPORTANT: 

Affix the small label with 4-5 digits of the

  WA100-PM’s IEEE address on the floor Plan to indicate

  its location.

4.

 Mount the WA100-PM in the driver cavity of the light

  fixture, or external to the light fixture, or to a junction box

  approved for the application. See 

Mounting

 

(page 12).

5. 

Connect low voltage wiring from the WA100-PM to the

  driver, switch(es) and/or sensors as appropriate for your

  application. See 

Wiring

 (pages 3-11). Cap any unused wires.

Risk of electrical shock. Disconnect power before servicing or  

installing product. 

Install in accordance with National Electric Code and local codes.

WARNING

Risk of injury. Wear safety glasses and gloves during installation and 

servicing.

CAUTION

The 

Daintree WA100-PM Wireless Adapter forms part of the 

Daintree Networked wireless controls solution for smart

commercial and industrial buildings. It transmits and receives 

messages over the wireless ZigBee

®

 network and controls lights.

The WA100-PM is an AC powered device that provides On/Off 

switching as well as 0-10V analog dimming control for

LED drivers and ballasts.* It also provides power for low voltage 

occupancy sensors, photosensors (daylight harvesters),

wall switches, and control signals while it provides the wireless 

adaptation that enables them to communicate with the

rest of the wireless control solution. The control signals to and 

from these connected devices pass between the WA100-PM

and the Wireless Area Controller in Daintree Controls Software 

(DCS) web application.

Error/Test 

— On when the Wireless Adapter is in an error state. 

Flashes to indicate unit Reset and during Installation Test Mode (red).

Joined 

— On when the Wireless Adapter has joined a ZigBee

®

 network. 

Flashes to indicate Reset and during sensor Installation Test Mode (green).

Power 

— On when power is applied to the Wireless Adapter (green). 

 

LED Indicators

6.

 Connect line voltage wires from the supply circuit to the

  WA100-PM and to the driver as shown in 

Wiring

. Cap any

  unused wire.

7.

 Check load circuits then turn on the circuit breakers to power    

  up the WA100-PM. The light connected to the WA100-PM turns  

  On when power is initially applied (and when power is restored  

  after a power failure).

8.

 Ensure the WA100-PM green Power        LED is On.

9.

 Press and hold the blue RESET button on the WA100-PM for  

  3 seconds to reset the unit. Release the button when the green  

  Joined        LED and the red Error        LEDs begin flashing.

10.

 Perform the installation test appropriate for your application.   

 See 

Installation Tests

 (pages 13-14)

Power

LED

Reset

Button

Joined

LED

Error

LED

Summary of Contents for GE Current WA100-PM

Page 1: ...network and controls lights The WA100 PM is an AC powered device that provides On Off switching as well as 0 10V analog dimming control for LED drivers and ballasts It also provides power for low volt...

Page 2: ...n Off no dimming provides On Off control using its line voltage Switched Load connection and its low voltage digital output to an external relay Note both outputs are switched at the same time in this...

Page 3: ...he Black Hot flying lead and the Red Switched Load flying lead are 14AWG The White Neutral flying lead is 18AWG Low voltage 22AWG flying leads provide for connections to supply low voltage power and c...

Page 4: ...Wireless Adapter WA100 PM 4 Figure 3 Wiring Identification Figure 4 Dimming Light Fixtures 7 Wiring Continued Perform Installation Test Suite 1 DIP Switches Driver Type On Off 0 10V dimming Wired Sens...

Page 5: ...s Occupancy Sensor configuration This configuration allows the WA100 PM to provide automatic On Off switching based on occupancy Set occupancy sensor for minimum time delay 7 Wiring Continued Perform...

Page 6: ...or for minimum time delay Figure 8 Dimming Light Fixture s Photosensor configuration This configuration allows the WA100 PM to provide automatic 0 10V dimming control and to switch light fixtures On O...

Page 7: ...ght Fixture s and Switch configuration This configuration allows the WA100 PM to provide 0 10V dimming control and to switch light fixtures On Off It also provides manual On Off control through a low...

Page 8: ...ching This configuration allows the WA100 PM to alternate in switching separate drivers providing no load 0 partial load according to the driver loading or full load 100 Always connect the smaller pro...

Page 9: ...gure 14 208V 2 Pole Phase to Phase wiring This configuration allows the WA100 PM to provide On Off switching of a branch circuit 7 Wiring Continued OFF ON OFF ON Perform Installation Test Suite 1 DIP...

Page 10: ...gure 15 Switching Contactors This configuration allows the WA100 PM to provide On Off switching control to an external contactor 7 Wiring Continued OFF ON Perform Installation Test Suite 1 DIP Switche...

Page 11: ...V output from the WA100 PM and the Emergency Light Fixture operates at maximum output from the Emergency power circuit Note If the RRU 2 is not installed the Emergency Fixture will dim to minimum beca...

Page 12: ...is included with the WA100 PM Affix this label to the outside of the fixture Choose a standard location so that when someone looks for fixtures containing a WA100 PM they will easily find it Using the...

Page 13: ...e 2 Any Driver Occupancy Sensor 1 Press and immediately release the blue Reset button The red Error LED flashes once then pauses and repeats 2 Check that the connected lights cycle On and Off or cycle...

Page 14: ...the green Joined LED and the red Error LEDs begin flashing Test Suite 4 Continued 4 Operate the switch es connected to the WA100 PM and observe that the lights turn On Off and Dim as expected 5 Press...

Page 15: ...own after the sensor s internal time delay expires Therefore set occupancy sensors for the minimum time delay during the WA100 PM installation The red Error LED is flashing once every second DIP switc...

Page 16: ...lug load circuit Wiring for Combination Plug Load Basic Aux Relay and On Off Light In the wiring diagram below the WA100 PM is used to control both an On Off light and a plug load circuit Plug Load Ap...

Page 17: ...plug load circuit Plug Load Applications Continued Perform Installation Test Suite 1 DIP Switches Driver On Off 0 10V dimming Plug Load On Off Wired Sensor None On 1 2 3 4 5 6 2 3 On OFF ON 0 10V Dim...

Page 18: ...t and a plug load circuit Plug Load Applications Continued Perform Installation Test Suite 1 DIP Switches Driver On Off Plug Load On Off Wired Sensor None On 1 2 3 4 5 6 2 4 On OFF ON 0 10V Dimming ou...

Page 19: ...RECT TYPE DISPOSAL OF USED BATTERIES ACCORDING TO THE INSTRUCTIONS WFA100 PM Input Voltage 120 277VAC 50 60Hz Switched Output 15A driver incandescent 120 277VAC Relay 1hp 120 230VAC switched to Hot Ac...

Reviews: