4-2
INM12006 – MOOM V3.0
Copyright Dairymaster 2015
4
Mechanical
Pre requisites
The following are the minimum prerequisites for the successful mechanical aspects
of the installation of the MooM
Equipment & basic checks required:
1.
Suitable scaffolding or lifting equipment that are necessary to accommodate
working at heights.
2.
It is the responsibility of the installer to ensure that all required statutory
safety requirements have been adhered to before attempting installations
at height.
3.
Suitable mechanical fixing equipment – drills, mechanical fixings, etc are
available on site.
4.
Ensure a survey has been conducted by a suitable person for any building
services, which may be in place before attempting any drilling or cutting in
the building fabric.
5.
It is the responsibility of the installer to the work area meets any required
statutory safety requirements and that all safety measures have been
adhered to before attempting any installation or maintenance works.
Summary of Contents for MOOMONITOR +
Page 1: ......