4.

 

Once trench dug to correct size and depth, place concrete slabs at each end where angle braces are located 
on the box (approx. 1000mm 

 1200mm from end of box). 

 

5.

 

Level these slabs so they are approx. 512-515mm below the finished height of paving or concrete. Place 
spirit level on pool headers and lay across the trench propping the other end up so spirit level is level, using 
the level measure down to slabs to obtain correct depth of slab, use rubber mallet to tape down to bed slab 
in.

 

6.

 

Once both slabs are in place and at correct level place blue metal or aggregate along the trench making sure 
you do not exceed more than 50mm above the slab height, for boxes with a centre brace or braces leave a 

small amount out so brace doesn’t touch the blue metal.

 

7.

 

Once blue metal is down you are ready to place box into hole. Carry box to the trench edge, place rope or 
straps under each end of box and use these to lift and lower into hole. 

 

8.

 

With box in the hole and end braces are sitting on concrete slabs level box up to required height via the 4 
bolts inside the box, screw all 4 down so they touch the concrete slabs and then every 1 turn gives you 
approx. 1mm of lift. 

                    

 

 
 
 
 
 
 
 
 