OFF
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
6
5
6
ENGLISH
GENERAL MENU
Go back - exit
Parameter scrolling: next (2) ; previous (3)
Modify settings data: increase (4); decrease (5)
Confirm - access Menu
SET POWER
POWER
TEMPERATURE SET
ROOM AIR TEMP SET
H2O TEMP SET
USER MENU
*ENABLE V1
* AIR V1
SET CHRONO
ENABLE CHRONO
RESET
ENABLE PRG1
EASY SET UP
ENABLE PRG2
STATUS
**STOVE STATUS
ENABLE PRG3
ENABLE PRG4
SETTINGS
SET CLOCK
START PRG1
LANGUAGE
STOP PRG1
DISPLAY
MONDAY PRG1...
STAND-BY
...SUNDAY PRG1
** TECHNICIAN
MENU
SET PRG1
* WHERE PRESENT
** RESERVED TO THE
TECHNICIAN
SAME STEPS FOR THE OTHER ONES
3 TIME SLOTS
The company has an optional additional board that allows the boiler the following further functions when managing the system.
The table below indicates the various possibilities that the optional can offer.
DHW Storage Management
p
Puffer Management
p
3 heating areas
p
Instant DHW option
p
Puffer pump or 4th heating area management
p
Anti-legionella management for DHW storage
p
DHW storage chrono management
p
Auxiliary output management and control
p
BASIC INSTRUCTIONS
�
The following recommendations must be followed the first
times the stove is ignited:
�
Faint smells may be produced due to the drying of the paints
and silicones used. Do not remain in the environment for long
periods.
�
Do not touch the surfaces as they could still be unstable.
�
Air the room well several times.
�
The hardening of the surfaces is terminated after several
heating processes.
�
This appliance must not be used to burn waste.
�
Before lighting the stove, the following points must be verified:
�
The hydraulic system must be completed in compliance with the
guidelines of the regulations and the manual.
�
The tank must be full of pellets.
�
The combustion chamber must be clean.
�
The burn pot must be completely free and clean.
�
Check the hermetic closure of the fire door and the ash drawer.
�
Check that the power supply cable is connected correctly.
�
The bipolar switch in the rear right part must be positioned on 1.
43