30
OPERATION
OBJECT OF THE
CHECK
PERIODICITY
ACTIONS TO TAKE
REFERENCE
CHECK
PRIMARY AND
SECONDARY AIR
FANS
BEGINNING SEA-
SON
check that the fans turn and do not
cause vibrations, in case remove the
excess dust and dirt.
Fig.3.3.1A-B
GRID HANDLING
SYSTEM
BEGINNING SEA-
SON OR AFTER A
LONG INACTIVITY
PERIOD
Check for foreign bodies on the slide rod
and that the end runs correctly function
Fig.xx
ELECTRIC SYS-
TEM
BEGINNING SEA-
SON OR AFTER A
LONG INACTIVITY
PERIOD
Test the differential switch functioning.
Check connections with the earthing
system.
REDUCERS
BEGINNING SEA-
SON
check the oil level of the reducers from
appropriate warning light. If the level is
low, top-up with corresponding oil.
Fig.3.3.1A-B
LUBRICATION
GRID HANDLING
SYSTEM
ONCE A MONTH
Clean and grease the slide bar
Fig.10.2
AIR VENTILATION
PIPES BLADES
BEGINNING SEA-
SON OR AFTER A
LONG INACTIVITY
PERIOD
lubricate the rotary transversal pin of the
internal blade of the primary and sec-
ondary air pipe using spray oil
Fig.7.7
SCREW PINION
BEARING
BEGINNING SEA-
SON
Using a greasing nipple, grease the
bearing.
Fig.3.3.1A-B
tab.9.2
9. MAINTENANCE
9.1 Generality
The heat generator must be submitted to regular maintenance to guarantee the efficiency of all
components determining the correct operating of the generator and its main yield.
Tab. 9.1
sum-
marises the main operations.
ATTENTION!!
BEFORE MAINTENANCE, DISCONNECT THE ELECTRIC ENERGY
FROM THE GENERATOR BY INTERVENING ON THE MAIN
SWITCH AND ENSURE THAT THE RESIDUE FUEL INSIDE THE
FIREBOX IS OFF AND HAS COOLED DOWN
ATTENTION!!
MAINTENANCE MUST ONLY BE CARRIED OUT BY QUALIFIED
STAFF
9.2 Table of the periodical maintenance operations